Laserfiche WebLink
boundarf (UGB) for a projected pOpulation in 2025 <br /> consistent with the population assumed in this Plan, in <br /> compliance with MWMC's discharge permit. MWMC's <br /> Capital Improvements Plan, as amended from time to time, <br /> shall be used as the Bide for detailed planning and <br /> .implementation of the WPCF proiect, the beneficial reuse <br /> proiect and the residuals proiect. <br /> <br />· c. ' Stormwater: Drainage/channel improvements and/or piping systems 3 6 <br /> inches or larger; proposed detention ponds; .ouffalls; water quality <br /> projects; and waterways and open systems. <br /> <br /> d. Specific projects adopted as part of the Metro Plan are described in the <br /> project lists and their general location is identified in the planned facilities <br /> maps in Chapter II of the Eugene-Springfield Metropolitan Public <br /> Facilities and Services Plan (Public Facilities and Services Plan). <br /> <br /> Appendix Ab Page7 1-34 <br /> <br /> <br />