Laserfiche WebLink
1. There are no'areas within the metropolitan UGB that will be difficult to serve with <br />wastewater facilities over the long-term (six to 20 years).assnming that public <br />infrastructure specifications and requirements of the developing area can be .addressed. <br />ApprOpriate en~neering desi~ practices must be used durin~ the develOpment and <br />expansion into sensitive areas that are approved for development (ex. - hillside <br />construction, etc.). · ~' ......... :xpr~ns~cn ExpanSion of the existing collection system will <br />be necessary to meet demands of growth over this time period. <br /> <br />2. Based on 2003 analysis, the Eugene-Sprin~mCield metr6politan area treatment facilities <br />system will require facility' improvements to address both dry and wet weather regulatory <br />requirements relating to pollutant load, and wastewater flows. Regional and local <br />improvements to the collection and tre_~tment swstems are planned for and will be. <br />implemented to allow for ~owth within the UGB and for re.gmlatory compliance. Thc <br /> <br /> ..... :4-,, 1,, ..... ,-1 +% ...... <br /> <br />· 3. The pro~dsion of long-term wast~watcr service in the Jasper-Natron area in Springfield <br />is contingent upon construction of the ~asper Road Wastewater Line Extension ~rom <br />Street to Brand Street. Completion oft. his sigT~ificant ;nfrastructure improvement will <br />enable this area to be served effectively. <br /> <br /> 4. The Willamette Heights area of Springfield requires installation ofwastewater lines to <br /> replace existing septic systems. There are related problems in this area' surrounding <br /> substandard streets and inadequately surveyed rights-of-way. <br /> <br /> q~. Add Table ~Sa following Table q6, aa followa: <br /> Table 16a <br /> MWMC Wastewater Treatment and Collection System Improvements, Rough Cost <br /> Estimate, and Timing Estimate <br /> <br /> 300 WPCF Treatment Project 2025 <br /> 301 Residuals Tre,tment Project $6,000,000 2018 <br /> 302 Beneficial Reuse Project 2018 <br /> 303 Wi_llakenzie Pump Sta~on $6,000,000 2010 <br /> 304 Screw pump Sta_fion $2,000,000 2010 <br /> 305 Glenwood pump Station $500,000 2012 <br /> <br /> *Cost estimated in 2004 dollars <br /> <br /> V:\SDCkMetro Plan Amendment. doc <br /> Last printed Last printed 3/2/2004 4:54:00 PM 1-51 <br /> <br /> <br />