My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A - PH on MWMC/Metro Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/22/04JEO
>
Item A - PH on MWMC/Metro Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:57:24 PM
Creation date
6/17/2004 8:20:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 4 <br /> To 05-06-04 Draft MWMC Minutes <br />the total project allocated to peak flow is 87.5% and is determined as <br />follows: 50% to Preliminary Treatment * 75% to Peak Flow = 37.5% plus <br />50% to Peak Flow Management * 100% to peak flow = 50% for a total <br />allocation to peak flow of 87.5% (37.5 + 50%) not 75%. The application of an <br />allocation percentage to the amount of required peak flow capacity is <br />irrelevant. Again, purpose of the SDC methodology is to equitably allocate <br />the costs of projects .between growth and existing users not to determine <br />capacity. The 29% allocated to growth would be 35 mgds - five more needed to serve <br />growth during the planning period. [This is an incorrect application of the 29% <br />(which was derived for the SDC methodology by dividing the 30 mgd <br />(growth's share of the required peak flow capacity through 2025) by the ~02 <br />mgd (the total amount of additional peak flow capacity required through <br />2025). The correct application of the 29% (actually 29.4%) is to multiply it <br />by the portion of a project cost that is allocated to peak flow within the <br />"Capacity" portion. For the headworks expansion project this is calculated <br />as follows: 50% to Preliminary Treatment * 75% to peak flow * ~00% to <br />"Capacity" *29.4 % = ~% and 50% to Peak Flow Management * ~00% to <br />peak flow * ~00% to "Capacity"* 29.4 % = ~4.7 % for a subtotal of 25.7%. <br />Therefore, the total allocation for growth for the Headworks expansion is <br />38.2 % (IZ5 % from average flow and 25.7% from peak flow).] In total, wc arc <br />being charged for 35 mgds more than the methodology identifies as being needed to serve <br />growth.[This is incorrect based on discussion above.] According to the <br />methodology, growth needs 10 mgds of dry weather (average flow) and 30 mgds of peak <br />flow. That is a total of 25% .[This is incorrect. These numbers do not have any <br />meaning and even if they did it is not correct to add together average flow <br />and peak flow. The SDC methodology is not intended to be used to <br />compute capacity, it is intended to allocate costs.], of thc cost, not thc 35% that <br />is allocated. The difference in cost is $1,664,000. [This number is invalid based on <br />the discussed reasons presented above.] <br /> <br />This problem exists throughout the allocation process and our objection is the same to <br />each of the allocation where-this problem exists. You can't charge growth for more than <br />the capacity needed to serve growth during' the planning period. In thc case of the <br />headworks, even under the proposed methodology, you can't charge more than 25% of <br />the cost of the headworks to growth. [This 25% value is invalid for the reasons <br />presented above. A reality check confirms the equity of the 38% allocation <br />to growth. Typically a "Capacity" project would be allocated ~00% to <br />growth. However, since there is a peak flow capacity deficit only 29.4 % of <br />the peak flow capacity is allocated to growth - the remaining 70.6 % of the <br />peak flow parameter is allocated to existing users. For the Headworks <br />Expansion project ~2.5% is allocated to average flow and 87.5 is allocated <br />to peak flow. Since ~00% of this ~2.5 % (average flow portion) is allocated <br />to growth and 29.4 % of the 87.5 % (peak flow portion) is allocated to <br />growth it makes sense that the final resulting allocation to growth is <br />between 25% and 50% of the total project costs. The 38 percent allocation <br /> <br /> Attachment 4 <br /> Page 3 of 17 4-6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.