My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 7 - Action MWMC Fac. Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/28/04Mtg
>
Item 7 - Action MWMC Fac. Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:54:44 PM
Creation date
6/24/2004 8:57:51 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the 20-Year Project List. A third public open house was advertised and held the evening of March 3, <br />2004. The commission held a public hearing on adoption of the 2004 MWMC Facilities Plan and 20- <br />Year Project List on April 22, 2004, and carried over the hearing to May 6, 2004, to allow time for <br />additional public review and testimony. <br /> <br />Except for the original 1977 "208 Plan," MWMC has not until this time updated the formal Facility Plan <br />to be approved by the DEQ. An approved Facilities Plan will incorporate the existing adopted plans (the <br />WWFMP and the Biosolids Management Plan), contain updated technical analyses and projections of <br />flows and loads, provide reasonable assurance of compliance with state and federal regulations and new <br />limitations and requirements in the NPDES permit (see next paragraph), and revise the capital <br />improvement projects to meet the needs for adequate operational facilities. Having a formally approved <br />Facilities Plans will also make MWMC eligible for public loans and grants. <br /> <br />As stated, the 2004 MWMC Facilities Plan will help to ensure continued compliance with regulatory <br />requirements that govern the quality of effluent discharged from the treatment works as well as <br />conditions for the collection and transmission ofwastewater to the treatment plant. These regulations <br />present legal requirements for the provision ofwastewater services to the community and form the <br />foundation for the design criteria used in formulating the 2004 MWMC Facilities Plan and associated <br />20-Year Project List. The DEQ reissued MWMC's National Pollutant Discharge Elimination System <br />(NPDES) permit in May 2002, which prompted the commission to pursue a thorough, updated Facilities <br />Plan to include the new ammonia and thermal load limits of the renewed permit, as well as the new <br />requirements to implement a Temperature Management Plan (TMP) and the WWFMP. Furthermore, a <br />comprehensive analysis of the treatment plant's processes and hydraulic capacities has led the <br />commission to include an evaluation and recommendation of alternative disinfection systems to mitigate <br />worker safety and community risk concerns in the 2004 MWMC Facilities Plan. <br /> <br />The treatment plant also currently faces a significant peak flow capacity deficit, which was projected in <br />the earlier WWFMP and has been validated and updated to the year 2025 based on an updated modeling <br />using more recent 2003-04 data. The present facility effort is prompted by the original <br />intergovernmental agreement which specified that when the sewage loading into the treatment plant <br />reached 85% of the initial design capacity, the commission would institute a program to expand and/or <br />upgrade the treatment system beyond the initial design capacity. This trigger point is now being reached <br />for several of the unit process capacities. <br /> <br />In the mid-1990s, the regional wastewater treatment facilities were modified to improve their <br />performance, and the commission recognized that the facilities were experiencing capacity limitations <br />relative to original design specifications. As a result, additional expansions would be needed to <br />actualize the projected 2004 design life. In 1996, the commission responded with a directive to produce <br />a master plan to evaluate short-term and long-range improvements necessary to improve facility <br />operations and meet increasing capacity and evolving performance demands. The MWMC Master Plan <br />was completed in 1997. Although it is not as comprehensive as the 2004 MWMC Facilities Plan, it did <br />provide analysis of historic flows, pollutant loads, and reporting data to identify capital improvements <br />needed to resolve shortfalls in the capacity for biosolids processing and peak flow management. <br /> <br />Later in 1997, the commission adopted the Biosolids Management Plan, which was derived from a <br />Citizen Advisory Committee (CAC) and engineering evaluation processes. This plan reflects the <br />commission' s adoption of strategy to resolve shortfalls in biosolids processing capacity and is based upon <br />an evaluation of available technologies, cost effectiveness, reliability, and public acceptance. The <br /> <br /> L:\CMO\2004 Council Agendas\M040628\S0406287.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.