My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 8 - Action MWMC SDC
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/28/04Mtg
>
Item 8 - Action MWMC SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:55:49 PM
Creation date
6/24/2004 8:58:20 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The cost impacts of new development on these components are allocated on the basis of p.m. <br />peak hour traffic on adjacent streets using either the trips specified in the Standard Calculation or <br />based upon an Alternate Calculation as set forth in Appendix B. <br /> <br />The detailed Cost of Service formula as well as the cost per trip for each component of the <br />transportation system is set forth in Appendix B. The cost per trip is the sum of all transportation <br />system components identified in Appendix B. <br /> <br />The transportation SDC for a proposed development is determined by multiplying the units which <br />describe the impact by the trip rate (to determine the number of trips assigned to the proposed <br />development) using the Transportation Trip Rates table in Appendix B and the cost per trip in the <br />current adopted SDC fee schedule in Appendix F. <br /> <br />4.0 Local (City) and Regional Metropolitan Wastewater Management Commission <br /> (MWMC) RegionaIWastewater Systems <br /> <br />Collection of the wastewater SDC includes both a local (City) and regional (MWMC) system <br />charge. <br /> <br /> 4.1 Local Wastewater System <br /> <br /> The local wastewater SDC is based upon estimated wastewater flow discharge (impact on <br /> and/or use of system capacity) from various development types. A unit cost of capacity in <br /> terms of cost per gallon per day is established and used to determine SDC rates. For <br /> residential development the rate is based on number of dwelling units and area of living <br /> space. For nonresidential development the rate is based on number of PFUs and the <br /> proposed development type. The detailed analysis, methods for calculating, and the Cost <br /> of Service formula for the local wastewater system can be found in Appendix C. The local <br /> wastewater SDC rates can be found in the current adopted fee schedule in Appendix F. <br /> <br /> The local wastewater SDC for a proposed development is determined by: <br /> <br /> · Number of Residential Dwelling Units (RDU) and area of living space for single- <br /> family, duplex, multiple-family, and other residential development <br /> <br /> · Plumbing Fixture Units (PFU) and proposed development type for other than <br /> Residential Dwelling Units (e.g., recreation center, convenience market). <br /> <br /> 4.2 Regional Metropolitan Wastewater Management Commission (MWMC) <br /> Wastewater System <br /> <br /> The City of Eugene entered into an Intergovernmental Agreement with the City of <br /> Springfield and Lane County in 1978, which established the Metropolitan Wastewater <br /> Management Commission. On May 15, 1997, the Commission adopted the MWMC <br /> wastewater Systems Development Charge which includes a regional administrative <br /> charge. On April 1,2004 the Commission adopted a modified MWMC regional wastewater <br /> SDC methodology. The regional MWMC wastewater SDC methodology is located in <br /> Appendix C2. Current regional rates are also summarized in the Appendix F fee schedule. <br /> <br />City of Eugene SDC Methodologies : - - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.