My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 8 - Action MWMC SDC
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/28/04Mtg
>
Item 8 - Action MWMC SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:55:49 PM
Creation date
6/24/2004 8:58:20 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2.4 City Cost of Construction Credit <br /> <br /> In calculating the credits given under section 7.2.1 and 7.2.2, the City Engineer <br /> shall estimate the cost of the capital improvement based upon what the City would <br /> pay were it to construct such improvements. <br /> <br /> 7.2.5 Revenue Collection for Equivalent Assessment or Special Benefit <br /> Credit <br /> <br /> When an equivalent assessment or a special benefit assessment is collected when <br /> property connects to a public improvement for which the City has granted a credit <br /> under 7.2.2 (3) above, the revenue collected (net of the costs of collection) shall be <br /> deposited in the SDC fund for the system to which connection was made and for <br /> which the credit was given unless the SDC fund has been reimbursed for the credit <br /> from other City funds. If the SDC fund has been reimbursed in advance from other <br /> City funds, the revenue collected will be deposited to the City fund which <br /> reimbursed the SDC fund. <br /> <br /> 7.3 Revocation of Credit and Impact Reduction <br /> <br /> A credit or impact reduction which has been applied to reduce SDC fees may be revoked <br /> and the unpaid portion of the SDC reimposed as a lien against the property, within the time <br /> required by these Methodologies, if: <br /> <br /> · The associated capital improvement for which SDC credit has been given is not <br /> constructed or completed as required, or fails to function as designed; or <br /> <br /> The associated reduction program for which an impact reduction has been <br /> approved is not instituted or is modified without the approval of the City Engineer, <br /> or ceases to function as designed. <br /> <br /> Such revocation shall not occur until ten days prior written notice has been given to and an <br /> opportunity to be heard afforded the applicant and property owner. If the credit or impact <br /> reduction is revoked, the City Manager may add to the amount due, the cost of the <br /> revocation proceedings. <br /> <br /> 7.4 Application for Credit and Impact Reduction <br /> <br /> An application for a credit or impact reduction, including related documentation and <br /> information, shall be submitted by the applicant in the manner prescribed by the City, <br /> together with any fee set by the City Engineer pursuant to Eugene Code, 1971 section <br /> 2.020. The applicant shall have the burden of demonstrating the eligibility for a credit. No <br /> credit or impact reduction shall be granted for an SDC that has already been imposed, <br /> collected or agreed to be paid in installments unless resulting from cancellation of an <br /> active permit, expiration of a permit without being used, or an approved change of design <br /> of an active permit. <br /> <br />City of Eugene SDC Methodologies -- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.