My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 8 - Action MWMC SDC
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/28/04Mtg
>
Item 8 - Action MWMC SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:55:49 PM
Creation date
6/24/2004 8:58:20 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 6 <br /> <br />Local Wastewater System Development Charge Analysis <br />1. Analysis of System Value <br />Total Replacement Cost - Pipe $415,212,3361 <br />Total Replacement Cost - Pumping Stations $15,850,693 <br />City Cost of future Projects within UGB $9,925,332 <br />Other Wastewater Components $3,253,455 <br />2. Analysis of Assessable Amount <br />.Size Total Cost <br />5-inch $9,434,085 <br />E~ to 48-inch $313,928,688 <br /> <br />Capacity ,~formation ~ ~II <br />4. Calculation of Wastewater SDC <br />Total System Valuation, existing and planned $444,241,8161 <br />:est per unit of capacity per gallon $2.2572 <br />II . Calculation of Reimbursement Percentage I <br />ICity System Capacity (EDUs)in mgd 49.01 <br />100.00% <br />IExisting Use in mgd 21.41 43.7% <br />IPercent Available for New Development in mgd 27.61 56.3% <br />ITotal va~ue of Reserve Capacity (val~e of system) ~ .~/ $62,122,2541 100'00% <br /> <br /> City of Eugene SDC Methodologies Wastewater~' ' <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.