My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 8 - Action MWMC SDC
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/28/04Mtg
>
Item 8 - Action MWMC SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:55:49 PM
Creation date
6/24/2004 8:58:20 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEM DEVELOPMENT CHARGE METHODOLOGY <br /> <br />TABLE 1 <br />Summary of Key Methodological Requirements <br /> <br /> Oregon Law Requirement MWMC Methodology <br />Methodology demonstrates consideration of the Allocates future improvement costs to growth in proportion to <br />need for increased capacity in the system to meetcapacity requirements <br />future users' demands <br /> <br />Combined Fee <br /> <br />Demonstrate that charge is not based on Determines total growth capacity requirements and the portion <br />providing the same capacity of capacity to be met through existing system available <br /> capacity and future capacity expansion. Calculates a weighted <br /> average cost of capacity. <br /> <br /> System Development Charge Methodology <br /> <br /> Overview <br /> The SDC methodology for MWMC is based on a combined reimbursement and <br /> improvement structure, as shown in Figure 1. The methodology consists of the following <br /> elements: <br /> <br /> · Determine capacity needs <br /> · Develop cost basis <br /> · Develop SDC schedule <br /> · Calculate revenue offsets and credits <br /> <br /> FIGt IRE 1--OVERVIEW OF MWMC SDC METHODOLOGY <br /> <br /> Existing Demand I Growth Demand <br /> <br /> : Existing Facilities I New facilities <br /> <br /> : I ' <br /> · Existing ~' <br /> ~ Capacity ($) New Capacity ($) ] <br /> · : Growth units (Avg. Flow, Peak Flow, BCD, TSS) : <br /> <br /> Average Flow (gal.) Peak Flow (gal.) BCD (lbs) <br /> <br /> Past <br /> payments Future Payments <br /> <br /> SEA31003271388(DG).DOC/041040034 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.