My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: Southbank Bike Viaduct: Metro Plan Amendment
COE
>
City of Eugene
>
Council Agendas 2009
>
CC Agenda - 09/22/09 Joint Elected Officials
>
Item 1: Southbank Bike Viaduct: Metro Plan Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:19:19 PM
Creation date
9/17/2009 2:37:44 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
9/22/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Meeting Date: <br />AGENDA ITEM SUMMARY <br />September 22, 2009 <br />Meeting Type: <br />Regular Meeting <br />Staff Contact/Dept.: <br />Mark Metzger <br />StaffPhoneNo: <br />726-3775 <br />EstimatedTime: <br />30 Minutes <br />S P R I N G F I E L D Council Goals: <br />Maintain and Improve <br />C I T Y C O U N C I L <br />Infrastructure and <br />Facilities <br />ITEM TITLE: <br />SOUTH BANK VIADUCT METRO PLAN AMENDMENT <br />ACTION <br />Conduct a first reading and public hearing on AN ORDINANCE AMENDING <br />REQUESTED: <br />THE EUGENE-SPRINGFIELD METROPOLITAN AREA GENERAL PLAN <br />TEXT, CHAPTER III, SECTION D, POLICY # 11; ADOPTING AN <br />EXCEPTION TO STATEWIDE PLANNING GOAL 15 WILLAMETTE RIVER <br />GREENWAY; ADOPTING A SEVERABILITY CLAUSE; AND PROVIDING <br />AN EFFECTIVE DATE. <br />ISSUE <br />A Metro Plan text amendment and an exception to Statewide Planning Goal 15— <br />STATEMENT: <br />Willamette River Greenway are necessary for the construction of a <br />bicycle/pedestrian viaduct structure (South Bank Viaduct) beneath the Willamette <br />River I-5 Bridges. The viaduct will allow the future development of a riverfront <br />path on the south bank of the Willamette River, connecting Eugene and Springfield <br />through Glenwood. <br />Metro Plan policy #D.11 of Chapter III-D (Willamette River Greenway, River <br />Corridors and Water Ways Element) requires the taking of an exception “if a non- <br />water dependent transportation facility requires placing of fill within the <br />Willamette River Greenway setback.” Viaduct construction may require fill to be <br />placed within the Willamette River Greenway setback. <br />ATTACHMENTS: <br />Attachment 1: Adopting Ordinance <br />Attachment 2: Staff Report (Exhibit A to the Adopting Ordinance) <br />Attachment 3: Planning Commission Recommendation and Draft Hearing Minutes <br />DISCUSSION/ <br />Eugene-Springfield has one of the largest networks of riverfront bicycle and <br />FINANCIAL <br />pedestrian facilities in the state. The current connection between Eugene and <br />IMPACT: <br />Springfield is limited to the north side of the Willamette River. The extensive south <br />bank Willamette River path system in Eugene ends at Interstate 5 because of the <br />physical barriers created by both the existing I-5 bridges and the proximity of <br />Franklin Boulevard (OR 126B) to the Willamette River. Users traveling between <br />the two cities along the south side of the Willamette River must cross to the north <br />side of the river near the I-5 bridge or divert to the shoulders of Franklin Boulevard <br />(OR 126B), a high speed arterial street. <br />An ODOT Transportation Enhancement Grant of almost $1 million, together with <br />$250,000 in OTIA funds and about $140,000 in donated materials will be used to <br />fund the South Bank Viaduct project. The timing of the project will allow reuse of <br />several concrete box beams from the Willamette River Detour Bridge on the <br />viaduct project. As the I-5 replacement bridges are completed, and the detour <br />bridge is removed, the South Bank Viaduct will be constructed. <br />The Central Lane MPO Regional Transportation Plan, TransPlan, the Glenwood <br />Refinement Plan and Willamalane Park and Recreation District Comprehensive <br />Plan, call for the continuation of the Willamette River “South Bank Path” through <br />Glenwood to Springfield. Construction of the South Bank Viaduct is essential to <br />the continuation and development of the South Bank Path. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.