Laserfiche WebLink
MWI~C FACILITIES PI. AN <br /> <br />TABLE 5.4.~-1 <br />Seasonal Land Application 2025 Design Criteria <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Unit Process Existing Criteria/Conditions Year 2025 <br />S~te Loading Criteria <br /> Nitrogen Loading <br /> Poplar Trees (liquid biosolids) 220 lbs N/acre 220 tbs N/acre <br /> Grass (dewatered biosolids) 120 lbs N/acre 120 tbs N/acre <br /> Biosolids Loading <br /> Poplar Trees (liquid biosolids) 3.4 dry tons/acre 5.4 dry tons/acre <br /> Grass (dewatered b~osolids) 4.2 dry tons/acre 4.2 dry tons/acre <br /> <br /> SiTE CHARACTERISTICS <br /> Available Land, total 7500 acres Unknown <br /> E)ewatered B~osolids Capacity, total 31,200 dry tons/year Unknown <br /> <br /> ~WMC_5 ~)_REVS_VKS.DOC <br /> 5-3O <br /> <br /> <br />