My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k~WMC FACILITIES PLAN <br /> <br />TABLE 6.2.2-1 <br />Summary of Secondary Ctarff]er Baffling and Mechanism Improvements - Alternatives Comparison <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> CapitaJ Cost <br /> Alternative (millions of dollars) <br /> <br />1 - Partial Retrofit - Baffling and Mechanism Retrofit $2.9 <br /> <br />2 - Partial Retrofit - Baffling and Mechanism Retrofit w~th $5.5 <br />Hew Effluent Launder <br /> <br />3 - Complete Retrofit - Baffling with Complete $7.O <br />Mechanism Replacement and New Effluent Launders <br /> <br />The baffling and associated miscellaneous improvements for each alternative are anticipated <br />to result in an increased secondary clarifier capacity of 20 to 30 percent. A capacity increase <br />of 40 percent has been observed in some installations; however, in the absence of stress <br />testing data for an WPCF secondary ctarifier, a conservative assumption of the increase in <br />clarifier capacity is estimated at a minimum of 20 percent. This translates to a sustained <br />peak surface overflow rate (SOR) of 1260 gpd/sf for each secondary clarifier and a total <br />sustained peak flow capacity of 134 mgd with all eight secondary clarifiers on line. <br /> <br />The three alternatives and their costs were presented at an October 2003 workshop with <br />Eugene-Springfield staff and CH2M HILL staff. Eugene-Springfield staff unanimously chose <br />to proceed with Alternative 2 as the preferred alternative. Stress testing of the retrofitted <br />secondary clarifiers can be conducted to determine the actual estimated capacity increase <br />resulting from the modifications. <br /> <br />6.2.3 Primary Clarification Enhancements <br />The WPCF currently uses a total of four primary clarifiers to treat screened and degritted <br />raw sewage. The existing primary clarifiers are circular, have outboard launders, and are <br />135 feet in diameter with 12-foot sidewater depths. The primary sludge is accumulated at <br />the bottom of the clarifier and thickened through compaction. Primary sludge solids are <br />drawn off with intermittent sludge pumpLng, and a sludge blanket is maintained within the <br />clarifier. Equipment for the existing primary treatment facilities is outlined in Table 3.2.2-2 <br />in Chapter 3.0. <br /> <br /> Plant operations personnel have observed that when the total plant flow exceeds <br /> approximately 72 mgd, the primary clarified effluent quality rapidly deteriorates. At flows <br /> around 86 mgd the primary sludge blanket begins to be washed out of the clarifier, resulting <br /> in negative TSS removals. <br /> <br /> An increase in prknary clarification capacity is necessary to address both current and fut~are <br /> PWWFs. Currently, all of the plant influent, including the P~VFs, must pass through the <br /> existing primary clarification facilities, which are limited in capadty. It is prudent to look at <br /> alternatives to optimize the performance of the existing primary clarifiers before considering <br /> the const~uc~on of new primary clarifiers. This approach will maximize the facility's <br /> existing investment in primary treatment facilities. <br /> <br /> MW~C_6.0_RE?I '~.DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.