My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILmES PLAN <br /> <br />Bi0cycle Farm Alternative 1 Capacity (dry tons) <br />MWMC Facilities Plan, Eugene. Spnngfield <br /> <br /> Liquid Biosotids on Dewatered Biosolids on <br /> Non-Buffer Areas Buffer Areas <br /> Year (425 Acres) (132 Acres) Total <br /> <br /> 2020 2228 675 2903 <br /> 2025 2128 612 2740 <br /> <br />The majority of the costs associated with Alternative 1 have already been absorbed in the <br />purchase of the land, installation of the distribution pipeline, construction of the BF pump <br />station (under construction), and the purchase of four hose reel application systems. Future <br />costs under this alternative include development of Phase 2 and Phase 3 expansions, and are <br />l~sted in Table 6.5.4-3. <br /> <br /> TABLE 6.5.4-3 <br /> B0cycle Farm A~temative 1 Cost Estimate <br /> MWMC Facilities Plan, Eugene. Springfield <br /> <br /> Capital Cost <br /> Expansion Phase item (2004 $) <br /> <br /> Phase 2 Site preparation of 130 acres $300,000 <br /> Purchase 2 hole reels $110,000 <br /> <br /> Phase 3 Site prepara[ion of t 30 acres $300,000 <br /> Purchase 2 hole reels $110,000 <br /> <br /> ~roTAL COST $820,000 <br /> <br /> Alternative 2 - Operate BF as an Irrigated Land Application Site <br /> Alternative 2 rel>resertts operating the BF as an Lrrigated land alppl/catior~ site. The t>rimary <br /> benefit of this alternative is that a greater amount of biosolids (liquid and dewatered) could <br /> be applied to the site. Under this alternative biosolids could be applied to the BF at the <br /> capacities shown in Table 6.5.4-4. <br /> <br /> TABLE 65.44 <br /> Biocycie Farm Alternative 2 Capacity (dry tons) <br /> MWMC FaclTities Plan, Eugene-Springfield <br /> <br /> Liquid Blosolids on Dewatered Biosolids <br /> Non-Buffer Areas on Buffer Areas <br /> Year (425 Acres) (132 Acres) Total <br /> <br /> 2005 1880 824 2704 <br /> 2010 2561 905 3466 <br /> <br /> 644 MWIVtC_60_REV1 ~ DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.