My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UV system expanded for 10 mgd of Level IV reuse <br /> <br />- Pipelines to additional reuse sites up to 10 mgd <br /> <br /> Reuse pump station and distribution system expanded to 10 mgd <br /> <br />Additional reuse projects include the application of 1.25 mgd of Level II reuse effluent to the <br />SIWF and 1.5 mgd of Level II reuse effluent at the Biocycle Farm. The Biocycle Farm would <br />require an irrigation pipeline and microspray distribution system. Table 7.3.1-1 (located at <br />the end of this chapter) summarizes the existing and proposed 2025 unit process, <br />equipment, and design criteria. <br /> <br />7.3.2 Biosolids Stabilization <br />Temperature-phased anaerobic digestion is currently recommended to provide for future <br />solids stabilization needs at the WPCF. Conversion to a two-phased digestion process will <br />delay or eliminate the need to construct a fifth lagoon and would provide for Class A <br />biosolids stabilization. Recommended new facilities include the following: <br /> <br /> Digester mixing improvements for existing three digesters <br /> Construct fourth conventional mesophilic digester <br />- Construct thermophilic digesters to provide Class A biosolids <br /> <br />Pre-pasteurization processes may also be considered for future solids stabilization to <br />provide Class A biosolids. However, the current recommended plan is based on two-phase <br />anaerobic digestion. Table 7.3.2-1 (located at the end of this chapter) sttmmarizes the <br />existing and proposed 2025 unit processes, equipment, and design criteria. <br /> <br />7.3.3 Facuitative Sludge Lagoons <br />At this time the need to construct a fi£th lagoon by a specific year is not recommended, nor <br />is it expected that a fifth lagoon will be needed within the design period. Overall plant VSS <br />reduction requirements are likely to be achieved even if VSS loading to the existing lagoons <br />exceeds design criteria due to proposed digestion system modifications. It is recommended <br />that lagoon VSS loading rates be closely monitored as upstream process improvements and <br />additions are implemented. Digester mixing improvements will increase the active volume <br />of the existing digesters, the addition of a fourth digester will provide additional digester <br />volume, and the potential use of an advanced digestion process will all contribute to <br />improved reduction in VSS loads to the lagoons. It is recommended that the existing <br />lagoons be relined in accordance with previous planning activities that are not part of this <br />facilities plan. Table 7.3.2-1 summarizes the existing and proposed 2025 unit processes, <br />equipment, and design criteria. <br /> <br />7.3.4 Biocycle Farm Land Application <br />The Biocycle Farm is a valuable asset to MWMC's biosolids application program. The <br />current operation as a non-irrigated land application site provides enough capacity to <br />reduce and maintain solids inventory in the FSLs throughout the design period. Therefore, <br />it is recommended that the site continue to operate in its current mode. The majority of the <br />costs associated with continued operation of the site have already been absorbed in the <br />purchase of the land, installation of the distribution pipeline, construction of the Biocycle <br /> <br />7-8 MWMC_70_REV4 DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.