My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILiTiES PLAN <br /> <br />summarizes the existing and proposed 2025 trait processes, equipment, and design criteria <br />for the peak flow management facilities. Figure 7.4.1-2 shows all the recommended facilities <br />for the systemwide solution. <br /> <br /> ~ 30 mgd through Tertiary <br /> Filtration <br /> Secondary Flow Management <br /> - 160 mgd ~ <br /> - 160 mgd through <br /> Primary/Secondary ~ <br /> <br /> Primary Flow Managemept ~ ~ <br /> - 140 mgd <br /> <br /> FIGURE 7.4.14 <br /> Recommended Process Flow Diagram for Peak Flow Management-- <br /> Parallel Pdma~ and Secondaw Tmatmem <br /> MWMC Facilities Plan, Eugene-SpringfieD <br /> <br />7,4.2 Process Flow Diagrams <br />Figures 7.4.2-1 and 7.4.2-2 (located at the end of this chapter) show the 2025 l~qtdds and <br />solids balances for the recommended system approach respectively. <br /> <br />7.5 Summary of Recommended Improvements <br /> <br />This Facility Plan outlines improvements to the regional wastewater facilities through the <br />design year of 2025. The recommended improvements result from those projects identified <br />in the current plmming process, and previously identified projects from other studies. Table <br />7.5-1 summarize the projects required to meet the 2025 facility needs. <br /> <br />TABLE 7.5-i <br />Summary of Recommended Improvements through Year 2025 <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br />Unit Process Improvements <br />Springfield Coltecbon System * Rehabilitate pubhc system in seven sub-basins. <br /> ,, Invest~gate further into the Gateway area and remediate as necessary. <br />Eugene Collection System · Rehabilitate public system in 21 sub-basins. <br /> ,, Install valve at 14th and Tyler. <br />W~llakenzie Pump Station ,~ Install additional pump station with four new 10 mgd pumps. <br /> · Install new force main connections. <br /> <br />7-10 MWMC_70_REV4 DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.