My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 RECOMMENDED PLAN <br /> <br />7.6 Identification of Project Phasing <br />The recommended improvements identified in Table 7.5-1 form the basis for the <br />development of a 20-year project list. To develop the project list, the t/ming of individual <br />facility improvements had to be ident/fled so that the overall regional wastewater needs <br />could be rnet without a deficit in capacity. For some of the recommended improvements, a <br />phased approach would provide flexibility in the level of improvements made. For example, <br />modifications to both the north and south aeration basins to convert them to a step-feed, <br />plug-flow air-activated sludge system with anoxic selectors do not have to be complete in <br />both basins to meet the/rdtial capacity needs. These modifications could be phased so that <br />the south basra is mod/fled initially, and the north basin is modified when futtrre flow and <br />loads demand additional capacity, although frorn an operational standpoint, having both <br />basins configured the same would be simpler. A phased approach to constructing facilities <br />provides a more stable ftmding process, delays tmnecessary capital investments until they <br />are needed, and allows for potential re-evaluation to implement appropriate future <br />technologies. Using this approach, the recommended improvements were broken down into <br />individual projects according to the facility needs over the planning period. For each project <br />component, a fact sheet was prepared that outlines the project name, project description, <br />project justification, project driver, and project trigger. The fact sheets are provided at the <br />end of this chapter. <br /> <br />7.7 Implementation Schedule <br /> <br />Using the project fact sheets, individual improvement projects were consolidated into <br />phases based on the project trigger, which defines when the project must come on line to <br />address capacity, regulatory, or other facility needs. Adjustments to the timing of some <br />projects were made so that large variations in annual capital improvement costs were <br />avoided. This was done without compromising facility needs and the approach resulted in a <br />relatively level cash flow requirement. The estimated cost of each phase is presented in <br />Table 7.7-1. The est/mated total cost for the recommended improvements in all phases is <br />approximately $144,000,000. The anticipated projects and estimated project costs that are <br />packaged in each phase are summarized in Table 7.7-2. <br /> <br /> The project costs estimated for each of the phases are order-of-magnitude estimates for <br /> construction and non-construction in 2004 dollars. The accuracy of this type of cost estimate <br /> typically ranges from -30 percent to +50 percent. Costs are based on 10 percent for <br /> mobilization/demObilization, bonds, and insurance; construction contingency of 25 percent; <br /> and engineering, legal, and administrative (ELA) of 25 percent. Construction costs are based <br /> on previous cost estimates or bid tabulations from similar projects. Costs for individual <br /> processes include site work, piping, electrical, I&C, and contractor markups. The 25 percent <br /> construction contingency is intended to cover unidentified and/or unknown items such as <br /> construction dewatering and subsurface structural support of buildings or structures. <br /> <br /> The project phasing is shown in Figure 7.7-1, and represents the twelve initial project <br /> phases. Figure 7.7-1 does not show offsite projects, such as the improvements to conveyance <br /> pump stations, the SIWF, the Biocycle Farm, and the BMF facilities. Figure 7.7-2 shows the <br /> project phasing required if the High-Rate Clarification alternative is required by DEQ. This <br /> <br /> MW~C_7.0_REV&DOC 7-13 <br /> <br /> <br />