Laserfiche WebLink
TABLE 7.2.1-1 <br />bquid Processes Design Criteria, Existing and 2025 Capacity Needs <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Unit Process Existing Criteria/Conditions Year 2025 <br /> Number of Ports 8 8 <br /> Port Diameter (inches) 42 42 <br />New Outfail <br />Type NA 1 Bank Outfall <br />Bank Outfall Diameter NA 96 inch <br />Notes: <br />~ Detention t~me computed does not include outfall pipe volume <br /> <br />N~,WtJC_TA~LE 721-1_REV7 DOC <br /> <br /> <br />