My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Screw Pump Station Expansion <br />Description: Add 5th pump to increase capacity from 84 to 99 mgd. <br />Justification: New pump is required to increase total influent pumping capacity to 277 <br /> mgd. <br /> <br />Project Driver: Systematic elimination of sanitary sewer ovedlows by the year 2010, <br />Project Trigger: Collection system computer model estimates the current wet weather <br /> peak flow to plant to be 264 mgd. Overall existing peak flow capacity is <br /> 175 mgd so there is already a capacity deficit. <br /> <br />Type of Project 100% Capacity <br /> <br />Estimated Project Cost $1,700,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2005/06 <br /> <br />Project Name: Witakenzie Pump Station Expansion <br />Description: Add four, 14-mgd pumps to increase capacity from 80 to 135 mgd. <br />Justification: Addibonal pumping capacity is required to increase tota~ influent pumping <br /> capacity to 277 mgd. <br /> <br />Project Driver: Systematic elimination of sanitary sewer overflows by the year 2010. <br /> <br />Project Trigger: Collection system computer model estimates the current wet weather <br /> peak flow to plant to be 264 mgd. Overall ex~stin9 peak flow capacity is <br /> 175 mgd so there is already a capacity deficit. <br /> <br />Type of Project 100% Capacity <br />Estimated Project Cost $6,000,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2005/06 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.