My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Headworks <br /> Expansion <br /> <br />Description: Expand headworks so that ail of the 2025 wet weather peak flow receives <br /> preliminary treatment. <br /> <br />Justification: New dry weather headworks that will be used in conjunction with the <br /> existing headworks (which will then be used for peak flow events) to <br /> provide preliminary treatment for a total peak wet weather flow of 277 <br /> mgd. <br /> <br />Project Driver: increases in peak wet weather flows resulting from the elimination of <br /> sanitary sewer overflows. <br /> <br />Project Trigger: Peak wet weather flows in excess of 210 mgd. <br />Type of Project 100% Capacity <br /> <br />Estimated Project Cost $12,800,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2007/08 <br /> <br />Project Name: Primary Sludge Thickening Outside of Clarifiers <br /> <br />Description: Thin primary s~udge pumping and piping systems to thickeners, (covered <br /> for odor control), supernatant ovedlow pumping and piping, thickened <br /> sludge piping/pumping to digesters. See Odorous Air Treatment for <br /> treatment of odors. <br /> <br />Justificatior~: One of the projects that increases capacity of existing primary clarifiers <br /> from approximately 103 mgd to 165 mgd. <br /> <br />Project Driver: All peak wet weather flows must receive primary treatment prior to <br /> diversion and effluent blending to meet the current NPDES permit for total <br /> suspended solids. <br /> <br />Project Trigger: Primary clariher surface overflow rates exceeding 1800 gpd/sf: Sustained <br /> wet weather flows through the primaries in excess of 103 mgd after <br /> baffling improvements are made. <br /> <br />Type of Project 100% Capacity <br /> <br />Estiroated Project Cost $3,600,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2007/08 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.