My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />1. Monthly sewer user rates, which are the primary source of revenue for the RWP, are to <br /> be equitably allocated to all customers based on a cost of service assessment. <br /> <br />2. New customers to the RWP shall pay an SDC. The Commission shah maintain the SDC <br /> methodology within the constraints of state law. <br /> <br />3. Existing and new sewer customers shall equitabIy contribute to the cost of Lhe RWP. To <br /> implement f_his policy, user rate and SDC methodologies will consider wastewater <br /> quantity, quality, and strength, consistent with state law. <br /> <br />4. MWMC rate structures shah be sufficient to fully fund reserves, comply with bond <br /> covenants, and cover the costs of constructing, operating, rehabilitating, maintaining, <br /> and improving the MWMC assets. <br /> <br />5. The Commission will attempt to adopt user rates that provide multi-year stability. <br /> <br />6. Costs of existing and future capacity for new customers shall be recovered by SDCs that <br /> are based on the cost of existing and required new capacity. <br /> <br />7. Costs of services (direct and indirect) provided to any public or private organizations by <br /> the RWP shall be recovered through appropriate fees or charges. <br /> <br /> Asset Management - Asset management policies are intended to guide the Corvwnission in <br /> protecting and safeguarding the investment in regional facilities and equipment. Capital <br /> asse~s Shall be kept in sound working condition. Replacement, maintenance, and <br /> rehabilitation shall be provided for so that total system costs are minimized while reliable, <br /> high-quality service and high water quality standards are maintained. <br /> <br />1. MWMC assets shall be insured for replacement value so that, in the evev. t of a loss, plant <br /> and equipment could be restored to working condition. <br /> <br />2. The Commission shall maintain a fully-funded Equipment Replacement Reserve so <br /> equipment can be replaced or rehabilitated when needed without creating volatility in <br /> the operating budget. <br /> <br />3. Equipment provided for by the Equipment Replacement Reserve shall include all roiling <br /> stock, all computer equipment, and all other equipment with a historical cost between <br /> $10,000 and $200,000, a projected replacement cost between $10,000 and $200,000, axed <br /> with a useful life expectancy of between 1 and up to 20 years. <br /> <br /> 4. Major rehabilitation work shah be funded from the Capital Reserve and appropriated <br /> annually into a budget line item called Major Rehab. <br /> <br /> 5. The Major Rehab work shall be capitalized if it extends the useful life of the asset <br /> beyond the original estimate. If the Major Rehab work does not extend the life of the <br /> asset, but enables the asset to reach its originally estimated useful life, then it wilJ be <br /> considered major maintenance work and not capitalized. <br /> <br /> 84 MWMC_B.O~REV5 DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.