My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br /> Primary diversion pump station <br /> Secondary diversion pump station <br /> Clarifier upgrades: primary clarifier baffles, primary clarifier blending structure, <br /> secondary clarifier baffles <br /> Two new secondary clarifiers <br /> New high-rate disinfection basin <br /> New effluent blending and outfall structure <br /> New tertiary filtration system <br /> New bank outfall <br /> New bioscrubbers for odor control <br /> New reuse disinfection facility <br /> New digester <br /> WAS thickening building expansion <br /> <br /> BAFFLED TREATMENT BAFFLED TWO NEW <br /> P~MARY ' O~VERSION P~P SEC~DARY <br /> CLARIFIERS ~ STAT~O~ CLARIRERS STRUCTURE <br /> <br /> ~ Normal SecondaryTreatm~t Flow Paths <br /> <br /> ~ New Dr,/and Wet Weather <br /> Dual Uae Facihflea <br /> <br /> ~ New Wet Weather Peak Flow Fac~ht~ea <br /> <br /> FIGURE 9.4.1-1 <br /> Proposed Layout for System Alternative 1 - Parallel Pdmary and Secondary Treatment <br /> MWMC Facilities Plan, Eugene-Springfield <br /> <br /> 9,4,2 Water Quality <br /> Compared to System Alternative 1, System Alternative 5 could result in potential ne§alive <br /> impacts to water quality in the Willamette River. These potential impacts would be <br /> temporary and would be related to project construction activities. However, compared to <br /> System Alternative 1, the implementation of System Alternative 5 during the operational <br /> <br /> 9-10 MWMC_CJ 0_REVI4 DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.