My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4793
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:14 PM
Creation date
7/7/2004 4:37:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/28/2004
Document_Number
4793
CMO_Effective_Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bIWMC FACILtTIE~ PLAN <br /> <br />The upgrade qualified all nine buildings to meet the current building code requirements for <br />seismic loading. <br /> <br />Public Health Risk from Catastrophic Release of Chlorine and Sulfur Dioxide <br />Structural deficiencies at the plant could pose health risks if a seismJc event resulted in <br />structural damage to facil/ties and building collapse (risk to plant workers), or cherrfical <br />release (risk to plant workers and the public). However, the recommended seismic upgrades <br />have been completed and, therefore, potential public health risks from seismic activity near <br />the WPCF are low. Additional information on the RMP for chlorine and suifiar dioxide is <br />presented above. <br /> <br />Biosolids Transpor~ <br />Biosolids are transported £rom the WPCF via pipeline to the BMF at a separate site. There, <br />they are put into a sludge lagoon and subsequently processed (dewatered). The dewatered <br />cake is transported via trucks to cooperative farms for land application. These are Class B <br />biosolids, highly regulated, and not fit for land application on crops for humm-t <br />consumption. Alternatively, biosolids will be pumped in liquid form to the Biocycle Farm <br />for liquid land application, or dewatered cake will be transported via truck for land <br />application. Because biosolids are transported offsite, via pumping or by truck, and spread <br />for land application, there is potential for a spill. However, a cleanup and response protocol <br />for biosolids spills is in place, and the potential for pUblic health hazards res~xlting from a <br />biosolids spills is low. <br /> <br />Public Hea~th Risks from Biosolids Transport <br />As noted above, biosolids are transported to onsite application areas through an enclosed <br />biosolids distribution system, and dewatered cake is transported via trucks to cooperative <br />farms for land application. If additional neighboring land is required for disposal, biosolids <br />will be transported off site by truck. MWMC has developed a spill response plan that details <br />act/ohs to take in the event of a biosolids spill. The plan includes over-the-road spill <br />response and clean-up proceduress. <br /> <br />2.2.5 Energy Management and Consumption <br />During development of the 1997 Master Plan (CH2M HILL, 1997), a condition assessment of <br />the WPCF was performed. This evaluation confirmed that the facility's energy consumption <br />is extremely low ha comparison to other similar treatment facilities. The plant operating staff <br />has been very cognizant of energy consumption in the operation of the fac4~ty, and has been <br />aggressive in both implementing improvements to reduce energy consumption and in <br />obtaining grant funding to implement those improvements. Staff also have further managed <br />continuous improvement of energy consumption through development and <br />implementation of a Environmental Management System. The WPCF is ISO 14001 certified <br />and includes an ongoing objective to reduce energy consumption. Numerous work <br />programs have been implemented that indude targets and measures to manage its <br />continuous improvement strategy. <br /> <br /> 5 MWMC's bioso~ids spill response and cleanup procedures are adapted from the Biosolids Hau~er Spill Response <br /> Procedure--CWEA Manual of Good Practice for Agricultural Land Application of IBiosohds, 1998. <br /> <br /> MWMC_2.0_REV23 DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.