Laserfiche WebLink
CONTENTS, GONTINUED <br /> <br />7.7-2 Recommended Project Phasing Plan with Capital Cost Estimates <br />8.2.1 MWMC Projected Personnel, Materials and Service Costs For Study Period <br />8.3.4-1 MWMC Sewer User Rate Data <br />8.3.4-2 Projected SDC Revenue for FY 2004 - 2005 <br />8.6.1-2 Improvement Fee Allocation of Proiects to Facility Process Components and <br /> Project Type <br />8.6.1-2 Summary of 20-Year Project List Allocations for Improvement Fee <br />9.4.1-1 Parallel FrLmary and Secondary Treatment Flow Strategy <br />9.4.2-1 Comparison of WPCF NPDES Permit Conditions With Predicted Conditions <br /> Under System Alternative 5 (Parallel Primary/Secondary Treatment) <br />9.4.8-1 Specffications of Vehicles and Equipment Used During Typical Froject <br /> Construction Activities <br />9.5.2-1 Comparison of WPCF NPDES Permit Conditions With Predicted Conditions <br /> Under System Alternative 4 (High-Rate Clarification) <br /> <br />Figures <br /> <br />ES-3 Alternative 5 Project Phasing Diagram <br />2.1-1 City Map <br />2.1-2 MWMC Service Area Map <br />2.1-3 Facility Map <br />2.2.2-1 Soils of the MWMC Serv4ce Area <br />2,2.2-2 Soils in the Vicinity of the Biocycle Farm, Seasonal Industrial Waste S~te and <br /> Biosolids Management Facility <br />2.2.2-3 Soils in the Vicinity of the Eugene-Spr~gfield Water PoLlution Control Fadl~ty <br />2.2.3-1 Geology of the MWMC Service Area <br />2.2.3-2 Relative Earthquake Hazard Map of the Eugene-Springfield Metropolitan Area <br />2.2.7-1 Dominant Vegetation Along Rivers <br />2.2.7-2 Land Cover Map for the Eugene-Springfield Area <br />2.2.7-3 Wetlands Map for the Eugene-Springfield Area <br />2.2.9-1 Zoning Map of the Eugene-Springfield Area <br />2.3.2-1 Historical Population for MWMC Service Area <br />2.3.3-1 Population Projection Summary <br />2.4.2-1 Zoning Map of the Eugene-Springfield Metropolitan Area <br />2.4.2-2 Zoning Map of the Facility Area <br />3.1.4-1 IvlWMC Major Pump Stations <br />3.Z1-1 Existing FacEdties <br />4.1.1-1 Average and Maximum Monthly Dry Weather Flow <br />4.1.1-2 Average and Maximum Monthly Wet Weather Flow <br />4.2.1-1 Dry Weather Maximum Month Loads <br />4.2.1-2 Wet Weather Maximum Month Loads <br />5.1,3~1 Dry Weather Maximum Month Effluent Concentration Requirements Based on <br /> Existing Mass Load Limitations and Projected Flows <br />5.1.3-2 Wet Weather Maximum Month Effluent Concentration Requirements Based on <br /> Existing Mass Load Limitations and Projected Flows <br /> <br />MWMC_CONTENT$_REV5 DOC 'Vii <br /> <br /> <br />