Laserfiche WebLink
3 E×~STING WAS'fEWATER FACILITIES <br /> <br />TABLE <br />Odgina~ Plant Construction and Facilities <br />MWMC Facilities plan, Eugene-Springfield <br /> <br /> Construction Project Year Description <br /> <br />Final Treatment 1984 Four effluent Pamhall flumes, four chlorine contact basins, <br /> sulfonation chamber, chemical building, plant water pump <br /> station, outfall structure, diffuser outfall, and bankside outlall <br /> <br />Secondary Control Complex 1984 Blower building, return activated sludge pump station <br /> <br />Solids Processing 1984 Add one new gas mixed prima~¥ digester, add gas mixing <br /> building for existing two primary digesters, new boiler building, <br /> modify floating covers on existing two b~osolids storage tanks, <br /> add polymer feed for flotation thickener <br /> <br />Seasonal Industrial Waste Site, Pump 1984 Industnal pump station, irrigation control building, aeration <br />Station, and Site Work basin, lagoon, and center pivot irrigation system <br /> <br />Phase 1 Biosolids Facilities 1985 Onsite dewatering facility using centrifuges, b~osolids storage <br /> tank, polymer <br /> <br />Operations Building 1984 Operations building and laboratory <br /> <br /> Maintenance Building 1984 Maintenance building, covered storage build~ng, storage <br /> buildings and steam cleamng building <br /> <br /> Subsequent upgrades t:o the original facilities and the add/don of new facilities have been <br /> completed since the initial plant came on line. Table 3.2.1-2 summarizes the major <br /> construction contracts associated with facility upgrades and additions. The end result of <br /> these construct/on proiects is the fac/lity as it stands today (Figure 3.2.1-1). <br /> <br /> TABLE 3.2.1-2 <br /> Plant Upgrades and Add~ti0nal Facilities <br /> MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Construction Project Year Description <br /> <br /> North Aeration Basin Upgrades 1996 Converted three o1 four north aeration basins from coarse <br /> bubble a~r diffusers to fine bubble membrane diffusers <br /> <br /> North Aeration Basin Upgrades 2002 Replaced membrane diffusers in aeration basin No. 3 <br /> <br /> North Aeration Basin Upgrades 2003 Replaced membrane diffusers in aeration basin Nos. 1 <br /> and 2 <br /> <br /> Pretreatment Upgrades 1995 Replaced comminutors with five vertical coarse screens <br /> and screening sluice system, new grit and solids <br /> dewatering equipment, and biofiiter <br /> <br /> Biosohds/Biocycle Farm Reclaim water 2004 Constructed 3.2-mgd plant effluent water I~ne to BMF for <br /> line non-potable water use and tree farm irrigation <br /> <br /> MWMC_3 O_REV 11 DOC <br /> <br /> <br />