My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2: Resolution Amending MWMC Regional Wastewater SDC Methodology
COE
>
City of Eugene
>
Council Agendas 2009
>
CC Agenda - 11/16/09 Public Hearing
>
Item 2: Resolution Amending MWMC Regional Wastewater SDC Methodology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:22:51 PM
Creation date
11/13/2009 11:02:22 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />System Development Charge Methodology <br />Introduction <br />This document serves as the system development charge (SDC) methodology for the <br />Metropolitan Wastewater Management Commission (MWMC) Regional Wastewater <br />System. The MWMC is the regional wastewater treatment agency for the Eugene- <br />Springfield metropolitan area. System development charges may be collected from all <br />development that connects to the Regional Wastewater System, including development that <br />changes the use of existing development, when the change of use results in a greater impact <br />on the system. <br />The methodology contained in this document was developed in accordance with Oregon <br />SDC legislation (ORS 223.297-223.314), and with the guidance of a Citizen Advisory <br />Committee (CAC) appointed by MWMC. Table 1 provides a comparison of key <br />methodological requirements from the Oregon Revised Statute (ORS) to elements of the <br />MWMC methodology. <br />TABLE 1 <br />Summary of Key Methodological Requirements <br />Oregon Law Requirement MWMC Methodology <br />Reimbursement Fee <br /> <br />Determine that existing capacity exists Explicitly calculates the portion of existing capacity available to <br />new users based on rated design capacities. <br />Methodology based on, when applicable: Methodology includes: <br />(a) Rate-making principles employed to finance (a) Consideration of capital financing costs <br />publicly-owned capital improvements <br />(b) Adjustment for grant-funded facilities <br />(b) Prior contributions by existing users <br />(c) Valuation based on appreciated cost (i.e., adjusted for <br />(c) Gift or grants inflation) <br />(d) Value of unused capacity or cost of existing (d) Determination of unused capacity <br />facilities <br />(e) Other relevant factors <br />Promote objective of future system users (1) Includes a credit against SDCs for properties subject to <br />contributing no more than an equitable share of past general obligation bond debt service charges through <br />existing system costs property tax payments. <br />(2) Provides guidance to calculate a credit against SDCs for <br />future estimated user charge payments used to fund debt <br />service associated with projects included on the SDC project <br />list. <br />Improvement Fee <br /> <br />Methodology demonstrates consideration of Provides a structured process for allocation of capital project <br />projected costs of capital improvements identified costs that is to be applied to an adopted project list <br />in an adopted plan or list <br />Page 4 OF 39 <br />EXHIBIT A <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.