Laserfiche WebLink
Exhibit A <br />3of 4 <br />Table 1b-Future (Beyond 20-Years) <br />Capital Investment Actions: Roadway Projects <br />GeographicEstimated <br />NameLimitsDescriptionJurisdictionCostLengthNumber <br />Project Category:New Arterial Link or Interchange <br />Status:Future <br />Eugene-Springfieldat Main StreetConstruct interchangeODOT$9,000,000027 <br /> Highway (SR-126) <br /> <br />Eugene-Springfieldat 52nd StreetConstruct interchangeODOT $9,000,000030 <br /> Highway (SR-126) <br />Beltline HighwayWest 11th Avenue to Continue widening to 4 ODOT$17,000,0001.14312 <br />Roosevelt Boulevardlanes; new RR Xing, <br />interchange @ WEP, grade <br />separation @ Roosevelt and <br /> turn lanes on West 11th <br />Ave (ODOT: West 11th <br />North City Limits Stage 3) <br />Project Category:Added Freeway Lanes or Major <br />Interchange Improvements <br />Status:Future <br /> I-530th Avenue/McVay Interchange reconstruction ODOT$15,000,000257 <br />Highwayto improve operations and <br />safety, reconstruct ramps <br />and bridges to modern <br />standards, and provide for 6 <br /> lanes on I-5. <br />I-105Washington/JeffersonAdd lane to NB on-ramp ODOT$5,805,0000.75154 <br />Street Bridgefrom 6th Ave, extend third <br />NB lane over bridge to Delta <br />Highway exit ramp <br />Eugene- I-5 to Mohawk BoulevardWiden to 6 lanesODOT$20,124,0002.6 728 <br />Springfield <br />Highway (SR-126) <br />Eugene-SpringfieldPioneer Parkway/Q StreetInterchange improvementsODOT$15,000,0000727 <br /> Highway (SR-126) <br />I-105Delta Highway to Coburg Widen to 6 lanesODOT$9,210,6001.19647 <br />Road <br />I-105Coburg Road to I-5Widen to 6 lanesODOT$11,842,2001.53648 <br />