Laserfiche WebLink
Flow Flow <br />FIGURE 2—EXISTING SYSTEM ALLOCATION <br /> <br />Existing Facilities <br />Step R-1: Allocate to Process Components <br />Assets Replaced <br />by Project List <br />Step R-2: Allocate to System Capacity Parameter <br /> Avg. Peak BOD TSS <br />Step R-3: YES <br />NO <br />Available <br />Reimbursement <br />No <br />Capacity? <br />Reimbursement <br />Fee Cost Basis <br /> <br /> <br />TABLE 4 <br />Existing System Available Capacity by Parameter <br />Average Flow Peak Flow BOD TSS <br />Variable (mgd) (mgd) (lbs/day) (lbs/day) <br />Existing capacity 49.0 175 66,000 71,600 <br />Current loading (current capacity required) 43.8 264 54,800 64,700 <br />Available capacity (value) 5.2 None 11,200 6,900 <br />Available capacity (%) 10.5% 0% 17% 9.6% <br />Source: 2004 Facilities Plan <br />Step Three – Project Valuation <br />Calculation of the improvement fee begins with a review of MWMC’s adopted 20-Year <br />Project List to determine the value of future projects. Project values are updated regularly to <br />reflect: 1) annual inflation for projects,:, as estimated by applying the Engineering News <br />Record national 20 city average Construction Cost Index to the original project estimate, and <br />2) actual costs for any bond-funded projects. <br />Step Four - Project Cost Allocation <br />The project cost allocation methodology, for use in determining the improvement fee cost <br />basis, is a four-step allocation process consisting of the following steps: <br />Page 13 OF 39 <br /> <br /> <br /> <br />