My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C: Adoption of Resolution Amending MWMC Regional Wastewater SDC Methodology
COE
>
City of Eugene
>
Council Agendas 2009
>
CC Agenda - 11/23/09 Meeting
>
Item 2C: Adoption of Resolution Amending MWMC Regional Wastewater SDC Methodology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:32:03 PM
Creation date
11/20/2009 10:33:55 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
entire treatment system. The refinement of the facility component allocation process for <br />MWMC relates to recognition of peak flow management costs. While it is likely that future <br />project lists will include projects entirely related to peak flow management, it is also likely <br />that portions of projects relating to various aspects of the treatment process (e.g., secondary <br />treatment) will also play a role in future peak flow management. <br />The following question needs to be answered when allocating project costs to facility <br />components: “Which specific facility component does the project expand or improve?” If the <br />project expands or improves more than one facility component, then project costs should be <br />apportioned relative to the expansion or improvement of each applicable component. <br />The allocation fractions from Table 3 are used to distribute costs by facility component to <br />capacity parameter, as was done for the existing system cost allocations. The basis for these <br />allocations is described in Appendix B. <br />Step I-3 of the project cost allocation methodology is to allocate costs to project types. The <br />three project types, which are intended to be representative of the complete project list, are: <br />1.—Projects or portions of projects that are related to increasing liquids and/or <br />Capacity <br /> <br />biosolids conveyance, treatment, and disposition capacity beyond existing design <br />standards (i.e., projects that provide the next capacity increment within the planning <br />period). <br />2.—Projects that increase system capacity by increasing the <br />Performance Improvements <br /> <br />level of performance provided by facilities. Unlike ‘capacity’ projects that relate only to <br />the next increment of capacity, performance upgrades are generally sized based on total <br />projected capacity needs at the end of the planning period (existing and future). <br />3.—Projects designed to remedy an existing system deficiency and do not <br />Rehabilitation <br /> <br />enhance system capacity. <br />Capacity and performance upgrade projects can be new facilities, or upgrade/expansion of <br />existing facilities. Rehabilitation projects are the replacement of outdated or worn out <br />equipment or facilities. <br />The majority of the projects will typically fall completely into one project type. However, <br />some projects may be split between capacity and performance types. The general criteria for <br />allocating projects to the above categories are shown in Table 5. These criteria should be <br />applied in the development of specific projects for inclusion in the appropriate planning <br />document or project list and should be considered and evaluated as part of the process of <br />adoption of such a plan or project list. <br />Page 15 OF 39 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.