My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4992
COE
>
City of Eugene
>
Resolutions
>
2009 No. 4960-4995
>
Resolution No. 4992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:51:10 PM
Creation date
11/30/2009 2:49:51 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
11/23/2009
Document_Number
4992
CMO_Effective_Date
11/23/2009
Author
Beth Forrest
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
¿°°®±¨·³¿¬» ®¿²µ·²¹òéÎ×ÈÑÑÄÜÊÊØÊÊÜÛÈÔÑÙÔÏÖiÊÚÎÑÑÜÍÊØÍÎÉØÏÉÔÜÑÜ <br />ì <br />³±®» ¼»¬¿·´»¼ »²¹·²»»®·²¹ ¬«¼§ ½±³°´»¬»¼ ¾§ ¿ ¯«¿´·º·»¼ °®±º»·±²¿´ · <br />®»¯«·®»¼ô ¾«¬ ¬¸» ÎÊÍ ¬«¼§ ½¿² ¸»´° ¬± °®·±®·¬·¦» ©¸·½¸ ¾«·´¼·²¹ ¬± <br />«®ª»§ò <br />Ì¿¾´» ÛÏòï ¾»´±© ¸±© ¬¸» ²«³¾»® ±º ¾«·´¼·²¹ «®ª»§»¼ ·² Û«¹»²» ¿²¼ <br />Ͱ®·²¹º·»´¼ ©·¬¸ ¬¸»·® ®»°»½¬·ª» ®¿²µ·²¹ò <br />Ì¿¾´» ÛÏòï Þ«·´¼·²¹ Ô»ª»´ ±º ݱ´´¿°» ᬻ²¬·¿´ º±® Û«¹»²» ¿²¼ Ͱ®·²¹º·»´¼ <br />Level of Collapse Potential <br />City <br />Low (< 1%) Moderate (>1%) High (>10%) Very High (100 %) <br />Eugene 56 52 29 0 <br />Springfield 28 4 3 2 <br />ͱ«®½»æ ÜÑÙßÓ× îððéò Ѱ»² Ú·´» λ°±®¬ ðéóðîò ͬ¿¬»©·¼» Í»·³·½ Ò»»¼ ß»³»²¬ <br />Ë·²¹ ο°·¼ Ê·«¿´ ß»³»²¬ò <br /≯» °±¬»²¬·¿´ ·³°¿½¬ ±º ³¿¶±® »¿®¬¸¯«¿µ» ±² ¬¸» Û«¹»²»ñͰ®·²¹º·»´¼ <br />¿®»¿ ¿®» «³³¿®·¦»¼ ¾»´±© ·² Ì¿¾´» ÛÏòëò <br />Ì¿¾´» ÛÏòîò ᬻ²¬·¿´ ׳°¿½¬ ±º Û¿®¬¸¯«¿µ» ±² ¬¸» Û«¹»²»ñͰ®·²¹º·»´¼ <br /> <br />¿®»¿ <br />Inventory Probable Impacts <br />Portion of Eugene/Springfield Metro <br />Entire City and surrounding region <br />Area affected <br />Many buildings will have no damage or light to moderate damage, <br />with heavy damage concentrated in vulnerable buildings (wood <br />Buildings <br />frame buildings with cripple walls, unreinforced masonry, etc.). <br />Total building damage estimated to be about $1,000,000,000. <br />Minor damage possible in areas of soft soils. Some bridges will <br />Streets within Metro Area <br />have moderate to extensive damage. <br />Minor damage possible in areas of soft soils. Some bridges will <br />Roads to/from Metro Area <br />have moderate to extensive damage. <br />Short outage of electric power is likely, with duration ranging from <br />Electric power <br />a few hours to 1 day. <br />Generally moderate damage to water, wastewater and natural gas <br />Other Utilities <br />systems, including pipe breaks. Probable damage to water and <br />wastewater treatment plants. <br />Up to 30 deaths and about 1,600 injuries. Casualties will be <br />higher for daytime earthquake than nighttime earthquake, <br />Casualties <br />because mostly wood frame residential buildings have lower life <br />safety risk. <br /> <br /≯» ¿¾±ª» «³³¿®§ ±º °±¬»²¬·¿´ ·³°¿½¬ · º±® ³¿¶±® »¿®¬¸¯«¿µ» ±² ¬¸» <br />Ý¿½¿¼·¿ Í«¾¼«½¬·±² Ʊ²»ò ͳ¿´´»® »¿®¬¸¯«¿µ» ©±«´¼ ¹»²»®¿´´§ ¸¿ª» <br />«¾¬¿²¬·¿´´§ ³¿´´»® ·³°¿½¬ ¬¸¿² ¸±©² ¿¾±ª»ò <br />ײ ¿¼¼·¬·±²ô ¬¸»®» · ¿ ³¿´´ ½¸¿²½» ¬¸¿¬ ¿ ³¿¶±® »¿®¬¸¯«¿µ» ½±«´¼ ®»«´¬ ·² <br />«¾¬¿²¬·¿´ ¼¿³¿¹» ±® º¿·´«®» ±º ¼¿³ «°¬®»¿³ ±º ¬¸» Û«¹»²»ñͰ®·²¹º·»´¼ <br /> <br /> <br />4 <br />State of Oregon Department of Geologic and Mineral Industries, Implementation of 2005 <br />Senate Bill 2 Relating to Public Safety, Seismic Safety and Seismic Rehabilitation of Public <br />Building,May 22, 2007, iv. <br />Page EQ-8 October, 2009 Eugene/Springfield Natural Hazard Mitigation Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.