My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: PH: Use of 108 Funds for Construction Financing
COE
>
City of Eugene
>
Council Agendas 2009
>
CC Agenda - 12/14/09 - City Council Meeting and Meeting of the Eugene Urban Renewal Agency
>
Item 5: PH: Use of 108 Funds for Construction Financing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:52:25 PM
Creation date
12/11/2009 10:46:55 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
12/14/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Repayment/Security: Repayment of HUD 108 funds would be supported by project-specific cash flow <br />and collateral, along with a debt service reserve from the Downtown Urban Renewal District. Local <br />governments that borrow HUD 108 funds must also pledge their current and future CDBG allocations as a <br />secondary source of repayment for the borrowing. However, the City does not anticipate utilizing future <br />CDBG allocations as a source of repayment for this project given the collateral package. The BEDI grant <br />may be used to offset risk by providing for loan loss reserves. Section 108 loans will not be secured by <br />the City’s general fund or any other general resources. Collateral and and security mechanisms are <br />outlined as follows: <br /> <br /> <br />a)Centre Court Cash Flow – Beam need only achieve approximately 50% occupancy in the building <br />to cover the interest-only payments that will be required during the first two years of the loan. <br />Cash flow from the building will cover principal and interest payment once occupancy is <br />stabilized. <br /> <br />b)Debt Service Reserve – A $600,000 debt service reserve funded through urban renewal is <br />established in the event cash flow is unable to cover the loan repayment at any given period. This <br />amount is enough to cover principal and interest payments for loan #1 and #2 for one year, which <br />would provide time for Beam or the City to solve occupancy problems contributing to the cash <br />flow problems. <br /> <br />c)Real Estate Collateral – The URA has positions on the Washburne Building and the Centre Court <br />and adjacent property as part of the existing Section 108/BEDI financing (loan #1). The URA <br />would seek expanded positions on the properties for loan #2. <br /> <br />d)Beam Owners’ Guarantees – Personal guarantees of the owners of Beam Development will be <br />required. <br /> <br />e)Other collateral as required by HUD <br /> <br />In the event that the primary sources to repay the HUD 108 loan are not realized, there are some <br />alternative strategies. As part of the agreement with Beam, failure to make a loan payment would enable <br />the URA to reclaim the Centre Court building. The URA could then: <br /> <br />f)Address any tenanting issues and sell the building to a private party <br /> <br />g)Work with other institutions to lease the space (e.g. an educational institution), or <br /> <br />h)Occupy the building with City offices and payoff the HUD 108/BEDI funds (because City <br />occupancy is not an allowable use under HUD regulations. Note: funds have not been identified <br />to pay off the Section 108/BEDI funds under this scenario.) <br /> <br />Next Steps <br />There are three remaining steps in the process to access and use HUD 108/BEDI funds for Beam’s <br />rehabilitation of the Centre Court Building: 1) public participation, 2) council approval to access <br />(authority to borrow) the funds, and 3) council action related to the Beam project to use the funds. <br /> <br />Step 1 – Public Participation: The public participation component includes a comment period, application <br />draft review, Loan Advisory Committee review, CDBG Advisory Committee review, and a public <br />hearing. To ensure that funds would be ready to use by the desired construction start date, the 30-day <br />public comment period officially began on November 30, with an advertisement in the Register Guard. <br />The ad explained the potential use of Section 108/BEDI funds and the process for commenting. Staff is <br />gathering written comments and comments via phone or email through December 31. As of December 7, <br />no comments had been received. In addition, a draft of the Section 108 individual application was <br />available at the reception desk of the Atrium Building starting on December 4; the availability of the <br />application materials was included in the Register-Guard advertisement. The Loan Advisory Committee <br /> Z:\CMO\2009 Council Agendas\M091214\S0912145.doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.