My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3G: Resolution adopting SDC Inflationary Adjustments
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 01/11/10 Meeting
>
Item 3G: Resolution adopting SDC Inflationary Adjustments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:09:34 PM
Creation date
1/8/2010 1:26:43 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
1/11/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />RESOLUTION NO. _____ <br />A RESOLUTION ADOPTING INFLATIONARY ADJUSTMENTS TO <br />SYSTEMS DEVELOPMENT CHARGES FOR PARKS SYSTEM, LOCAL <br />WASTEWATER SYSTEM, STORMWATER SYSTEM, AND <br />TRANSPORTATION SYSTEM; SUPERSEDING ADMINISTRATIVE <br />ORDER NO. 58-08-02-F; AND AMENDING RESOLUTION NO. 4900. <br /> The City Council of the City of Eugene finds as follows: <br />A. <br /> The System Development Charge (SDC) Methodologies were adopted by <br />Resolution No. 4900 effective May 7, 2007. <br />B. <br /> The SDC Methodologies adopted by Resolution No. 4900 have subsequently been <br />amended by Resolution Nos. 4929, 4977 and 4991. In addition, inflationary adjustments to <br />SDCs have been adopted for:(1) the Regional Wastewater System by Administrative Order No. <br />58-07-08-F, by Resolution No. 4943, and by Administrative Order No. 58-09-08-F; and for (2) <br />Local Wastewater System, Stormwater System, and Transportation System by Administrative <br />Order No. 58-08-02-F. <br />C. <br /> Based on: (1) the park development/renovation cost adjustment using the <br />Engineering News-Record 20-City national average Construction Cost Index and, (2) the park <br />land acquisition cost adjustment using the Lane County Assessment & Taxation office’s <br />published 2008 and 2009 Sales Ratio Reports, it is necessary to adjust the Parks System SDCs by <br />implementing a 22.5% increase in the Parks System SDC for residential development, and an <br />average 29.4% increase in the Parks System SDC for nonresidential development. <br />D. <br /> Based on the Engineering News-Record 20-City national average Construction <br />Cost Index, it is necessary to amend the Local Wastewater System, Stormwater System and <br />Transportation System SDCs by implementing a 6.8% increase for those SDCs. <br />E. <br /> Section 2.4 of the SDC Methodologies requires that revisions to fees by more than <br />five percent shall be established by resolution of the City Council. <br />F. <br />These inflationary adjustments to the SDCs are in conformity with applicable <br />state law, authorized by EC 7.710(5) and Sections 2.1 and 2.4 of the Methodologies, and should <br />be implemented effective April 1, 2010. <br />NOW, THEREFORE,based upon the above findings, <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a <br />Municipal Corporation of the State of Oregon, as follows: <br />Resolution – Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.