My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4: Ordinance Levying Assessments for Elmira Road
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 02/22/10 Meeting
>
Item 4: Ordinance Levying Assessments for Elmira Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:10:22 PM
Creation date
2/19/2010 11:35:27 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT A <br />ORDINANCE NO. ________ <br /> <br /> <br />AN ORDINANCE LEVYING ASSESSMENTS FOR PAVING AND <br />CONSTRUCTING CURBS, GUTTERS, SIDEWALKS, STREET LIGHTS, <br />STORMWATER DRAINAGE, AND WATER QUALITY FACILITIES ON <br />ELMIRA ROAD FROM BERTELSEN ROAD TO MAPLE STREET AND <br />ON MAPLE STREET FROM ELMIRA ROAD TO ROOSEVELT <br />BOULEVARD; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE. <br />(CONTRACT 2009-18) (JOB #4275) <br /> <br />The City Council of the City of Eugene finds that: <br /> <br /> <br />A. <br /> This project was initiated by Council action on April 11, 2005, by adoption of the <br />2006 Capital Improvement Plan and pursuant to Section 7.160(5) of the Eugene Code, 1971 <br />(EC). The preparation of plans and specifications and call of bids for construction of the local <br />improvements are based on Council Action on April 11, 2005 pursuant to EC 7.160(5). The local <br />improvements consist of paving and constructing curbs, gutters, sidewalks, street lights, <br />stormwater drainage and water quality facilities on Elmira Road from Bertelsen Road to Maple <br />Street and on Maple Street from Elmira Road to Roosevelt Boulevard. <br /> <br /> B. <br /> After due notice and a public hearing before the hearings official on April 2, <br />2009, the City Council formed the Local Improvement District and, on April 13, 2009, <br />authorized construction of the local improvement. <br /> <br />C. <br /> The actual cost of the local improvement is ascertained to be $2,919,363.70, and <br />the amounts to be assessed to, and borne by, the specially benefited property, and the amounts to <br />be borne by the City or others, have been determined in accordance with applicable provisions of <br />the Eugene Code and as set forth in the attached Exhibit A, which is incorporated herein by <br />reference. <br /> <br />D. <br /> The City Council has established the method of calculating local improvement <br />assessments in EC 7.170 and 7.175. <br /> <br />E. <br /> On February 2, 2010, a public hearing on the ordinance, as required by Section <br />28(2) of the Eugene Charter of 2002, was held before the hearings official as authorized by EC <br />2.007(4) and 7.187. More than ten days prior to the scheduled public hearing before the hearings <br />official a, notice containing the information required by EC 7.185 was posted on a public bulletin <br />board at City Hall and given by certified mail to the owners of the parcels of real property <br />subject to the assessment. The hearings official considered the assessment report of the City <br />Engineer and Finance Officer and the testimony and evidence presented at the hearing. <br /> <br />F. <br /> At least ten working days prior to the Council meeting, notice of the Council’s <br />consideration of this Ordinance was published in the Register Guard, and the Ordinance was <br />Ordinance - Page 1 of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.