Laserfiche WebLink
Exhibit D - Prior Program Activities <br />Program Activities from Prior Version of Plan Report <br /> <br /> The following program activities are provided for in the plan and are more fully <br /> described below. Costs are estimated in ~1989 dollars. The projects are not prioritized. <br /> The costs are predesign estimates and represent the high range of the projected cost. <br /> The primary funding sources are tax increment cash flow and tax increment bonding. <br /> FYg0 is considered to be year one. <br /> <br /> Parking Facility Loans <br /> <br /> · Parl~inq Facility, 8th and Willamette. Construction of a parking facility in <br /> conjunction with the development of the parcel at 8th and Willamette. Estimated <br /> Tax Increment contribution, $5,000,000 in year one. <br /> <br /> · Parl~inq Facility, ~1 ~th and Willamette. Loan for construction of a parking facility as <br /> part of the development at ~1 ~th and Willamette. Estimated loan $~1,000,000 in <br /> year one. <br /> <br />Public Space Improvements <br /> <br /> · Public Riqht-of-Way Redesi.qn. Redesign of Willamette Street between 8th and <br /> ~ 0th~ Olive between 8th and ~10th~ and Broadway between Willamette and Oak in <br /> accordance with the Mall Improvement Design Concepts, and to relate to future <br /> development along the street. Estimated cost, $2,~100,000 in year two and three. <br /> <br /> · Existin.q Plaza Redesiqn and Downtown Mall Restroom Development. Redesign <br /> of the plaza at the Broadway and Willamette intersection in accordance with the <br /> Mall Improvement Design Concepts. Development of new handicapped <br /> accessible public restrooms within the mall area. Estimated cost, $350,000 in <br /> year three. <br /> <br /> · Various Downtown Sidewal~Frontaqe Improvements, Site Preparation. Improve <br /> streets, street frontages, alleys, sidewalks, benches, lights, landscaping, signing <br /> for the handicapped, etc. in areas within Renewal District concurrent with site <br /> development. Estimated cost, $700,000 in years one and two. <br /> <br /> · Various Downtown Sidewal~Frontaqe Improvements. Improve street frontages, <br /> alleys, sidewalks, benches, lights, landscaping, signing for the handicapped, etc. <br /> in areas within or directly benefiting Renewal District. Estimated cost, $350,000 <br /> in various years. <br /> <br /> - 27 - <br /> <br /> <br />