My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: ODOT/Beltline Highway - River Road to Coburg Road
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 04/14/10 Work Session
>
Item A: ODOT/Beltline Highway - River Road to Coburg Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:04:04 PM
Creation date
4/9/2010 11:11:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELTLINE FACILITY PLAN PHASE II: RIVER ROAD TO COBURG ROAD: CONCEPT EVALUATION PROCESS <br /> <br />Measure Rating <br />System wide Vehicle Miles <br /> Significant decrease in system VMT relative to no-build (> 1%) <br />Traveled (VMT, as <br /> Modest decrease in system VMT relative to no-build (< 1%) <br />measured in forecast <br />regional travel demand <br /> No change in system VMT relative to no-build <br />model) Proxy for <br />Greenhouse Gas emissions <br /> Modest increase in system VMT relative to no-build (< 1%) <br />System wide vehicle delay Significant decrease in system VHD relative to no-build <br />(VHD, as measured in <br /> Modest decrease in system VHD relative to no-build <br />forecast regional travel <br />demand model) Proxy for <br /> No change in system VHD relative to no-build <br />Greenhouse Gas emissions <br /> Modest increase in system VHD relative to no-build <br />Impact to wetlands and N/A <br />sensitive habitats <br /> Wetland areas are enhanced <br /> No wetland or habitat impacted <br /> Would have wetland and habitat impacts <br />Impacts to parks and trails Non differentiator; all have minor impacts to isolated pieces of West <br />Bank Trail and trail on the east side of the river, which could be <br />mitigated in the design phase. <br />Consistency with ODOT Cannot be evaluated at this time; sustainability goals focus on <br />sustainability best practices construction methods, which will be considered during the design <br />and construction phase. <br />Impacts to historic and There are no known structures with historic status in the project <br />cultural resources area, nor are there known cultural resources. Any alternative would <br />undergo a cultural inventory before construction. <br />Cost effectiveness <br />Ю±ª·¼» ±´«¬·±² ¬¸¿¬ ¿®» ½±¬ó»ºº»½¬·ª» ¿²¼ ½¿² ¾» ·³°´»³»²¬»¼ ±ª»® ¬·³»ò <br />Objectives: <br />Ю±ª·¼» ±´«¬·±² ¬¸¿¬ ½¿² ¾» ·³°´»³»²¬»¼ ·² °¸¿» ¬¸¿¬ °®±ª·¼» ·²½®»³»²¬¿´ <br />¾»²»º·¬ <br />Ю±ª·¼» ¬·³»´§ ¿²¼ ½±¬ó»ºº»½¬·ª» °®±¶»½¬ ±´«¬·±² ¬¸¿¬ °»®º±®³ ¿ ¼»·¹²»¼ <br />¬¸®±«¹¸±«¬ ¬¸»·® »¨°»½¬»¼ ¼»·¹² ´·º» <br />Ó·²·³·¦» ±²¹±·²¹ ±°»®¿¬·±² ¿²¼ ³¿·²¬»²¿²½» ½±¬ <br />Measures: <br />Ý¿² ¾» ½±²¬®«½¬»¼ ·² °¸¿» ¬¸¿¬ °®±ª·¼» ·²½®»³»²¬¿´ ¾»²»º·¬ <br />ݱ²¬®«½¬·±² ½±¬ <br />Ѱ»®¿¬·±² ¿²¼ ³¿·²¬»²¿²½» ½±¬ <br /> <br />CONCEPT EVALUATION PROCESS_FEB23.DOC <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.