Laserfiche WebLink
Metropolitan Wastewater Management Commission Reserves <br />Operating Reserve is budgeted at $1,585,136,which is 10% of total Personal Services, Materials <br />and Services, and Capital Outlay in accordance with Commission policy. <br />EXHIBIT 7 <br />ADOPTED AMENDED PROPOSED <br />BUDGET BUDGET BUDGET <br />OPERATING RESERVES <br />FY 09-10FY 09-10FY 10-11 <br />Beginning Balance6,894,1548,301,98510,584,063 <br />User Fee Revenue24,550,34324,550,34325,940,795 <br />Septage Revenue116,208116,20880,000 <br />Other Revenue1,634,5001,634,5001,634,500 <br />Interest335,000335,000125,000 <br />Personal Services(8,660,632)(8,660,632)(8,609,080) <br />Materials & Services(6,542,280)(6,602,780)(6,538,359) <br />Capital Outlay(29,460)(29,460)0 <br />Interfund Transfers(7,413,743)(7,413,743)(10,839,845) <br />Transfer to Bond Debt Service Fund(2,880,957)(2,880,957)(5,301,288) <br />Debt Service - SRF Loan00(590,650) <br />WORKING CAPITAL <br />(900,000)(900,000)(900,000) <br />RATE STABILITY RESERVE <br />(3,560,850)(4,908,181)(2,000,000) <br />RATE STABILIZATION RESERVE <br />(2,000,000)(2,000,000)(2,000,000) <br />OPERATING RESERVE1,542,2831,542,2831,585,136 <br />CAPITAL RESERVES <br />The MWMC Capital Budget includes five reserves: the Equipment Replacement Reserve, SDC <br />Reserves (i.e. Reimbursement and Improvement), the Capital Reserve and the Bond Reserve. <br />These reserves accumulate revenue to help fund capital projects including equipment <br />replacement and major rehabilitation. They are funded by annual contributions from user rates, <br />SDCs, bond proceeds, and SRF loans. Each reserve is explained in detail below. <br />EQUIPMENT REPLACEMENT RESERVE <br />The Equipment Replacement Reserve accumulates replacement funding for three types of <br />equipment: 1) major/stationary equipment items costing less than $200,000 with useful lives of <br />20 years or less; 2) fleet vehicles maintained by the Eugene Wastewater Division; and 3) <br />computers that serve the Eugene Wastewater Division. Contributions to the Equipment <br />Replacement Reserve in the FY 10-11 budget total $796,000, additional budget details are <br />provided below. <br />The Equipment Replacement Reserve is intended to accumulate funds necessary to provide for <br />the timely replacement or rehabilitation of equipment, and may also be borrowed against to <br />provide short-term financing of capital improvements. An annual analysis is performed on the <br />Equipment Replacement Reserve. The annual contribution is set so that all projected <br />Page 21 DRAFT FY 10-11 BUDGET AND CIP <br />