My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of FY11 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 05/10/10 Meeting
>
Item 3: Ratification of FY11 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:16 PM
Creation date
5/6/2010 9:59:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br />non-construction price indices. Indices tracked include the Engineering News Record <br />Construction Cost Index, the Turner Building Cost Index, and the Consumer Price Index. <br />Regional Wastewater Program Capital Projects Budget <br />The following is a summary of the status of capital projects that are currently budgeted in the <br />FY 09-10 Regional Wastewater Program Capital Budget and those included in the proposed FY <br />10-11 Capital Budget. <br />The proposed Regional Wastewater Program Capital Projects budget consists of the projects in <br />the first year of the FY 10-15 five-year CIP, totaling $32,364,768. <br />Information regarding each project included in the FY 10-11 Capital Projects budget is included <br />in the CIP project summary sheets, included in this document. Each summary sheet provides a <br />description of the project, the project’s purpose and what is driving the timing of the project, <br />the funding schedule, and the expected final cost and cash flow for the project. For those <br />projects that are in progress, a short status report is included on the summary sheet. <br />Completed Capital Projects (Scheduled Completion by June 30, 2010) <br />In FY 09-10, several capital projects are projected to be completed and closed out. No CIP <br />summary sheets are included in this document for these projects because there is no expected <br />carryover of project funds to FY 10-11, and therefore no FY 10-11 budget for these projects <br />will be requested. All projects completed in FY 09-10 have been completed within the <br />Commission-approved capital budgets for each project. The completed capital projects are: <br />Aeration Basin Improvements – Phase 1 <br />Biocycle Farm - Phase 3 <br />Line Biosolids Lagoon - Phase 2 <br />Master Landscape Design & Implementation for the WPCF (The Landscape Design & <br />Implementation for the WPCF project established the integrated conceptual design for <br />the WPCF. It was funded by existing budgeted MWMC Capital Projects. Hereafter, <br />implementation of the landscape detailed design and construction will likewise be <br />funded through existing and approved project budgets) <br />Carryover Capital Projects (Projects Initiated in FY 09-10 or Earlier) <br />Most or all (depending on the specific project) of the remaining funding for capital projects that <br />were started or are on-going in FY 09-10 is carried over in this FY 10-11 budget. CIP project <br />summary sheets for these carryover projects are included in this document. Overall, the <br />funding for these projects continues to be consistent with the CH2M Hill 2006 re-costing of <br />capital projects. The on-going carryover projects are: <br />Clarifier Improvements <br />WWFMP Update <br />Page 39 DRAFT FY 10-11 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.