My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of FY11 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 05/10/10 Meeting
>
Item 3: Ratification of FY11 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:16 PM
Creation date
5/6/2010 9:59:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br /> <br />INFLUENT PUMPING IMPROVEMENTS AND HEADWORKS EXPANSION <br />Description: <br /> This project provides influent pumping improvements and headworks expansion required <br />to accommodate the 2025 peak wet weather flow of 277 mgd. Major components <br />include: upgrades to the Willakenzie Pump Station, expansion of the headworks facilities <br />with new screening and grit removal equipment, a new Influent Pump Station at the <br />WPCF, improvements to the regional force main system at two off-site locations, and <br />landscaping. Due to the time critical nature of this project, it was delivered using a <br />Construction Manager/General Contractor (CM/GC) project delivery process. <br />Status: <br />Construction stage. The majority of the construction was completed in December 2009. <br />The work remaining in FY 10-11 is landscaping. <br />Justification: <br /> Improved influent pumping and headworks hydraulic capacity are required to increase <br />total plant influent hydraulic capacity to 277 mgd (the forecasted 2025 peak flow) and to <br />meet redundancy requirements for pumping and screening. <br />Project Driver: <br />Ability to provide treatment to peak flows and systematic elimination of sanitary sewer <br />overflows by the year 2010. <br />Project Trigger: <br />Collection system computer model estimates the current wet weather peak flow to plant <br />to be 264 mgd. Overall existing peak flow capacity is 175 mgd so there is already a <br />capacity deficit. <br />Project Type: <br />100% Capacity <br />Improvement <br /> SDC Eligibility: <br />38% <br />Estimated Project Cost <br />: $28,054,000 <br />Expected Cash Flow: <br />FY 05-06 = $16,348;FY 06-07 = $376,293; FY 07-08 = $2,132,064;FY 08-09 = <br />$9,644,009; FY 09-10 = 15,758,000; FY 10-11 = $127,286 <br />Expenditure/Category:Prior Years2009-10 Est. Act.2010-112011-122012-132013-142014-15Total <br />Design/Construction $12,168,714 $15,758,000 $127,286 $0$0$0$0$28,054,000 <br />Other $0$0$0$0$0$0$0$0 <br />Total Cost $12,168,714 $15,758,000 $127,286 $0$0$0$0$28,054,000 <br />Page 52 DRAFT FY 10-11 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.