Laserfiche WebLink
Metropolitan Wastewater Management Commission Capital Improvement Program <br />EFFLUENT REUSE - PHASE 2 <br /> <br />Description: <br /> This project is identified as Level C Effluent Reuse at the Biocycle Farm in the 2004 <br />MWMC Facilities Plan. Provide 1.5 mgd of Level 2 reuse water at the Biocycle Farm <br />and installation of dedicated reuse irrigation pipeline and microspray system. Total reuse <br />of 3.75 mgd in July and August. The project may change as planning progresses and <br />other opportunities for effluent reuse emerge. <br />Status: <br />Ongoing planning phase. The MWMC reached a settlement agreement on October 28, <br />2009 with the Department of Environmental Quality (DEQ) related to Willamette River <br />total maximum daily loads (TMDL) for temperature. <br />Justification: <br /> Implements Level C reuse program to reduce the MWMC thermal load discharge into the <br />Willamette River. <br />Project Driver: <br />Expansion of effluent reuse programs. Address NPDES permit thermal load compliance <br />related to Willamette River total maximum daily loads (TMDL) temperature requirements. <br />Project Trigger: <br />Potential exceedance of NPDES thermal load limit. Identification of water needs for <br />potential clients. <br />Project Type: <br />100% Performance <br />Improvement <br /> SDC Eligibility: <br /> 26% <br />Estimated Project Cost: <br />$5,152,000 <br />Expected Cash Flow: <br />FY 09-10 = $200,000; FY 10-11 = $3,300,000; FY 11-12 = $1,652,000 <br />PriorEst. Act. <br />Expenditure/Category:Years2009-102010-112011-122012-13 2013-14 2014-15Total <br />Design/Construction 0$200,000 $4,952,000 0000$5,152,000 <br />Other 00000000 <br />Total Cost $0$200,000 $4,952,000 $0$0$0$0$5,152,000 <br />Page 62 DRAFT FY 10-11 BUDGET AND CIP <br />