My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of FY11 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 05/10/10 Meeting
>
Item 3: Ratification of FY11 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:45:16 PM
Creation date
5/6/2010 9:59:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Budget Message <br />BUDGET MESSAGE <br />To the Metropolitan Wastewater Management Commission: <br />I am pleased to present the Metropolitan Wastewater Management Commission’s (MWMC) <br />budget for fiscal year (FY) 2010-11. This budget funds operations, administration, and capital <br />projects planned for the Regional Wastewater Program (RWP). The MWMC administration and <br />Capital Improvements Program (CIP) components of the budget are reflected in the City of <br />Springfield’s RWP budget. The operations, maintenance, equipment replacement, and major <br />rehabilitation components are reflected in the City of Eugene’s RWP budget. The Cities’ <br />Industrial Pretreatment Programs, managed locally in compliance with the MWMC Model <br />Ordinance, also are included in the RWP budget. <br />This year’s budget reflects a continued focus on design and construction of capital improvements <br />planned to ensure that operation of the Regional Wastewater Facilities meets environmental <br />regulations, and that adequate capacity will be provided to meet the needs of a growing service <br />area. The FY 10-11 capital budget and FY 10-11 – FY 14-15 capital improvements work plan, <br />which are included in this budget document, are derived from the 2004 MWMC Facilities Plan. <br />The budgeted amount for FY 10-11 Facilities Plan capital improvement projects is $32,364,768; <br />$28,032,993 is carryover from unfinished projects budgeted in FY 09-10, and $4,331,775 is new <br />funding programmed in FY 10-11.The FY 10-11 capital budget also includes Major <br />Rehabilitation, Equipment Replacement and Major Capital Outlay capital projects, budgeted at <br />$105,579, $50,000 and $0 respectively.The total capital budget for FY 10-11 is approximately <br />$32,520,347. Approximately $11 million of the total capital budget will not be spent in FY 10- <br />11, but is included to enable contracts for construction that will occur in FY 10-11. Unspent <br />funds will be carried forward to the FY 11-12 budget as appropriate. In order to fund the actual <br />cash flow requirements of the FY 10-11 CIP, the Commission will use State Revolving Fund <br />(SRF) loans as well as strategic draw downs of capital reserves. <br />The FY 10-11 RWP Operating Budget for Personnel Services, Materials and Services and <br />Capital Outlay expense is $15,158,939. Consistent with the Commission’s Financial Plan and <br />policies, the FY 10-11 budget maintains and uses several reserves, which are fully described in <br />this budget document. Finally, the FY 10-11 budget includes debt service payments totaling <br />$8,441,938 as scheduled for repayment of $47.3 million of revenue bonds issued in November <br />2006, and an additional $52.7 million in borrowing in FY 08-09 to fund the Facilities Plan <br />capital improvements. <br />Revenue sources necessary to fund Operations, Capital programs, debt service requirements and <br />reserves include user charges, system development charges (SDCs), interest earnings and a small <br />amount of miscellaneous revenues. For FY 10-11, user fee revenues (including septage service) <br />are projected at $26,020,795. This level of revenue is projected based on a 5% increase in <br />regional wastewater user fees, as recommended by the MWMC financial advisor in order to meet <br />the Commission’s Financial Plan policies and net revenue objectives. Projected SDC revenues <br />will be reduced about 11% over the FY 09-10 budgeted SDC revenue to reflect the continued <br />downturn in development. Revenues from SDCs are projected at approximately $589,000. <br />In summary, the projected FY 10-11 budget funds operations and administration sufficiently to <br />maintain existing levels of service, and to meet the environmental performance and other legal <br />Page 1 DRAFT FY 10-11 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.