Laserfiche WebLink
Section 600 - Project Activities <br />In order to achieve the objectives of this plan, the following activities may be undertaken <br />on behalf of the City of Eugene by the Renewal Agency, in accordance with applicable <br />Federal, State, County, and City laws, policies, and procedures. <br />A. PUBLIC IMPROVEMENTS <br />1. Street, Curb, and Sidewalk Improvements <br />Improvements within the renewal area may require the construction of new <br />street, curb, sidewalks or sidewalk improvements, such as widening, within the <br />plan area. The Renewal Agency may participate in funding sidewalk and <br />roadway improvements including design, redesign, construction, resurfacing, <br />repair and acquisition of right -of way for curbs, streets, and sidewalks, and <br />pedestrian and bicycle paths. Projects to be undertaken include, but are not <br />limited to: <br />• Local street, curb, and sidewalk improvements identified in the Eugene <br />Capital Improvements Program (CIP), the Vision For a <br />Greater Downtown Eugene Report, and the Courthouse <br />District Concept Plan. <br />• Other curb, sidewalk and street improvements identified by the <br />Renewal Agency. <br />2. Public Utilities <br />The development proposed for the renewal area may require the replacement <br />and construction of water, storm and sanitary sewer facilities, environmental <br />mitigations. These improvements may include, but are not limited to: <br />• Sanitary sewer, water, and storm water system upgrades & replacements <br />identified in Eugene Capital Improvements Program <br />3. Streetscape Projects <br />This activity will enable the Renewal Agency to participate in activities improving <br />the visual appearance of the plan area. These improvements may include, but <br />are not limited to: <br />• Accent paving <br />• Decorative lighting <br />• Street trees, planters, and landscaping <br />• Furnishings, including tables, benches, kiosks, telephone booths, drinking <br />fountains, trash receptacles, bicycle racks <br />• Street and directional signage <br />• Public art and water features <br />• Gateway monuments and landscape features <br />• Undergrounding of overhead utilities <br />Urban Renewal Plan For Central Eugene Adopted: September 13, 2004 <br />