My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20328 R(3)
COE
>
City of Eugene
>
Ordinances
>
2004 No. 20307-20332
>
Ordinance No. 20328 R(3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 1:37:42 PM
Creation date
5/26/2010 2:43:40 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20328
Document_Title
An Ordinance Adopting an Amended Urban Renewal Plan for the Central Eugene Project
Adopted_Date
9/13/2004
Approved Date
9/15/2004
CMO_Effective_Date
9/15/2004
Signer
James Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan means the Urban Renewal Plan for the Central Eugene Project. The plan consists <br />of Part 1, text and Part 2 exhibits. <br />Proiect means any undertaking or activity within the central Eugene project, such as a <br />public improvement, street project, or loan program which is authorized by and <br />implements provisions set forth" in the Urban Renewal Plan. <br />Plan area means the entire Central Eugene Project plan area. <br />Redeveloper (see Developer) means any individual or group which acquires property or <br />which receives financial assistance for the physical improvement of publicly or privately <br />held structures and land within the project area. <br />Rehabilitation means the act or process of returning a property to a state of utility <br />through repair or alteration which makes possible an efficient, contemporary use while <br />preserving those portions or features of the property which are significant to its <br />historical, architectural, and cultural values. <br />Report on the plan means the textual material and graphic exhibits required by ORS <br />457.085 (3) which explains existing conditions, activities, procedures, and proposals of <br />the plan. <br />State means the State of Oregon and its various agencies, divisions, and departments. <br />Tax increment financing means a method of financing urban renewal projects as <br />authorized by ORS Chapter 457, which uses the tax revenues generated by the <br />increased taxable values in a defined area to pay for improvements within that area or <br />benefiting that area. <br />Text means Part 1 of this Urban Renewal Plan for the Central Eugene Project. <br />Section 300 — Legal Descriptions <br />Legal Boundary <br />The Central Eugene Project includes that area of approximately 70 acres as originally <br />established in 1968. <br />The following is a legal description of the boundary of the Central Eugene Project plan <br />area: <br />The project area includes all of the land within the boundaries designated on the Project <br />Boundaries Map attached as Exhibit A and is described as containing all lots or parcels <br />of property, situated in the City of Eugene, County of Lane, State of Oregon, bounded <br />generally as follows: <br />D <br />Urban Renewal Plan For Central Eugene Adopted: September 13, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.