Laserfiche WebLink
<br /> <br /> <br />The process envisioned for the project to date has been a combined Alternatives Analysis (required by <br />FTA) and Draft Environmental Impact Statement (required for use of federal capital funds). FTA also <br />provides for a sequential process where the alternatives analysis can be prepared first, using the same <br />analysis we are preparing for the original process. This analysis will be used to winnow the range of <br />alternatives down to a more manageable number. The alternatives analysis will be followed by a process <br />of selecting a preferred alternative to be taken into the preparation of the Draft Environmental Impact <br />Statement. <br /> <br />This has the benefit of breaking the overall decision into more manageable pieces which will assist in <br />facilitating the community’s decision-making on the project. It also puts the first part – the selection of <br />the locally preferred alternative – into this calendar year. <br /> <br />Public Outreach on Process Change <br />At an open house on June 9, LTD was able to share the results of the preliminary analysis to date and <br />made recommendations. Sixty-four people attended the open house and provided comments <br />(summarized in the next section). In addition to this open house, other public meetings on this topic <br />include: <br /> <br /> <br />June 1 – EmX Steering Committee <br />o <br /> <br />June 2 – WEEE Corridor Committee <br />o <br /> <br />June 3 – WEEE Design Options Local Advisory Committee meeting <br />o <br /> <br />June 3 – WEEE Design Options Open House <br />o <br /> <br /> (June 9 Open House on Process Change) <br />o <br /> <br />June 15 – WEEE Corridor Committee (Review of data and recommendations) <br />o <br /> <br />June 17 – MPO Citizen Advisory Committee <br />o <br /> <br />Out of 64 attendees at the June 9 open house, 29 comments were received which are summarized in the <br />following table: <br /> <br />- <br /> Terminus Options - Retain Eliminate <br /> <br />Seneca Terminus Option8 13 <br />Commerce Terminus Option 15 6 <br />Cone/Willow Creek Terminus <br />Option 1 18 <br />- <br /> Alignment Alternatives <br />Amazon Alignment Alternative 1 27 <br />7th Place Alignment Alternative 9 15 <br /> <br />In the next section there is more information about the preliminary analysis of the alignment and <br />terminus options. <br /> <br />Results from Preliminary Analysis <br />Information from the technical analyses completed to date suggests that certain alternatives may no <br />longer be viable. This information is detailed and summarized in the attached Key Preliminary Results <br />and West Eugene EmX Extension Alternatives Analysis Refinement Evaluation. <br /> Z:\CMO\2010 Council Agendas\M100623\S100623A.doc <br /> <br />