<br />Access Management <br />Access management is the term used to describe a broad set of techniques that balance the need to provide <br />safe, efficient, and timely travel with the ability to allow access to individual properties. The proper <br />th <br />implementation of access management techniques along the West 11 Avenue Corridor is expected to <br />reduce collision rates, congestion, and air pollution while also conserving energy and increasing corridor <br />th <br />capacity. Access management will help preserve the ability of West 11 Avenue to function as a major <br />arterial and provide a safer walking and cycling environment. In doing so, it will also help preserve long- <br />term property values and the economic viability of abutting development. <br />th <br />To maintain and improve the function of the West 11 Avenue corridor as a major arterial, an access <br />th <br />management strategy is needed because there are approximately 193 access driveways on West 11 <br />Avenue between Green Hill Road and Chambers Street (approximately 4.5 miles of roadway). Most of <br />these driveways are located east of Commerce Street, where the average driveway spacing is 75 feet. This <br />is a significant number of driveways, especially for a roadway that has been designated a major arterial and <br />whose key function should be to provide mobility instead of access. <br />th <br />A short-term access management plan was developed for West 11 Avenue from Green Hill Road to <br />Chambers Street and is provided in Figures 6-1 through 6-4 and in Table 6-1. Treatments include closures <br />th <br />of access points, consolidation of accesses, and relocation of access driveways along West 11 Avenue to <br />improve safety, circulation, and traffic operations. The plan also includes the installation of traffic <br />separators and medians in selective locations to improve safety (by minimizing conflict points) and <br />enhance operations. In addition, the findings from the safety analysis (see Chapter 5) were incorporated in <br />the short-term access management plan. <br />Signal Timing <br />th <br />Traffic signal timing was assessed for the section of West 11 Avenue between Green Hill Road and City <br />View Street to determine if new traffic signal timing would provide improved traffic operations and <br />th <br />contribute to reduced travel times through the corridor. Currently, the traffic signals along West 11 <br />Avenue between City View Street and the Fred Meyer driveway operate in a coordinated system at a cycle <br />th <br />length of 80 seconds from 7:00 am until 7:00 pm on weekdays. The signals along West 11 Avenue from <br />Bailey Hill Road to Gree (uncoordinated). <br />th <br />Vehicle travel times, delay and stops can be reduced along the West 11 Avenue corridor by implementing <br />new coordinated signal timings between City View Street and Terry Street. During the PM Peak, breaking <br />the corridor into two systems and operating with a cycle length of 100 seconds from City View Street to <br />Bailey Hill Road and a 110 second cycle length for the signals between Bertelsen Road and Terry Street <br />results in improved operation. During the AM Peak, a cycle length of 90 seconds is estimated to provide <br />the largest improvement. Field implementation may find that a break in the system between Bailey Hill <br />Road and Bertelsen Road (and two different cycle lengths) may serve the traffic more efficiently in the AM <br />Peak. In either case, the system performance measures show an improvement in the corridor operations if <br />new coordinated signal timings are installed from City View Street to Terry Street. <br /> <br /> <br /> <br />th <br />West 11 Avenue Corridor Study September 4, 2009 <br />City of Eugene P07265-003-000 <br />2 <br />