My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: West 11th Transportation Corridor Study
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 07/12/10 Work Session
>
Item B: West 11th Transportation Corridor Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2010 11:42:44 AM
Creation date
7/9/2010 10:30:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
7/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Table 3-1: Existing Study Area Roadway Characteristics <br />Functional Street Travel Posted Bike <br />c <br />Roadway Sidewalk <br />a <br />Classification Width Lanes Speed Lanes <br />thb <br />W 6 Ave Major Arterial 46 4 (WB) 30-40 Yes No <br />thb <br />W 7 Ave Major Arterial 46 to 4 (EB) 30 Yes No <br />thb <br />W 11 Ave (west of Terry St) Major Arterial 2 55 No No <br />thb <br />W 11 Ave (between Terry St Major Arterial 74 (with 4/5 45 Yes Yes <br />and Danebo Ave) median) <br />thb <br />W 11 Ave (between Danebo Major Arterial 5 45 Yes No <br />Ave and Beltline Rd) <br />thb <br />W 11 Ave (between Beltline Major Arterial 5 35 Yes No <br />Rd and Garfield St) <br />th <br />W 11 Av (east of Garfield St) Minor Arterial 3 (WB) 30 Yes No <br />th <br />W 13 Av (east of Garfield St) Minor Arterial 3 (EB) 30 Yes No <br />Green Hill Rd Minor Arterial 2/3 55 No No <br />Terry St Major 2/3 25 Yes No <br />Collector <br />Ed Cone Blvd Major 3 Not Yes West end <br />Collector Posted only <br />Danebo Ave Minor Arterial 3 45 Partial Yes <br />Willow Creek Rd Minor Arterial 46- 2/3 45 Yes Yes <br />Beltline Rd (south of 5th Ave) Major Arterial 350 2 55 No Paved <br />Shoulders <br />Commerce St Local 2/4 25 Yes No <br />Bertelsen Rd Minor Arterial 3 40 Yes Yes <br />Bailey Hill Rd Minor Arterial 3 35 Yes Yes <br />Seneca Rd Minor Arterial 3 35 Yes No <br />Tyinn St Local 2/3 30 Yes No <br />Oak Patch Rd Major 2 30 Yes No <br />Collector <br />Conger St Local 2/3 25 Some No <br />McKinley St Major 2/3 30 Yes No <br />Collector <br />City View St Major 2/3 25 Yes No <br />Collector <br />th <br />Garfield St (between W 6 Major Arterial 4 30 Yes No <br />th <br />Ave and W 11 Ave) <br />th <br />Chambers St (between W 6 Major Arterial 5 30 Yes Yes <br />th <br />Ave and W 7 Ave) <br />th <br />Chambers (south of W 7 Ave) Minor Arterial 3 30 Yes Yes <br />a <br />Obtained from City of Eugene Street Classification Map. November 1999, Figure 60; This map is in Appendix A of the <br />Eugene Arterial and Collector Street Plan (ACSP). <br />b ththth <br />West 11 Avenue west of Beltline Road and West 6 and 7 Avenues are classified by ODOT as Statewide Highways <br />and are designated freight routes. <br />c <br />Characteristics are only provided for sections of roadways within the project study area. <br /> <br /> <br />th <br />West 11 Avenue Corridor Study September 4, 2009 <br />City of Eugene P07265-003-000 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.