<br />The acquisition of 300 Country Club for police services has changed the space footprint required to <br />consolidate a majority of City services located downtown into one site. In addition, it is likely that the <br />City will continue to occupy existing space in the Atrium Building and on the fourth floor of the Library <br />for the foreseeable future. The estimated space need for City Hall is approximately 100,000 square feet <br />depending on what services are located in the facility. <br /> <br />The cost projection to build a new City Hall on the existing site ranges from $40 to $50 million. <br />Projections are based on estimated space needs of City functions in a range of consolidation options. <br />Project costs would include demolition of the existing structure and construction of a new building <br />based on a more compact footprint and efficient layout leaving a good portion of the site as open space <br />that could be utilized for future expansion. <br /> <br />Ultimately, the level of consolidation will depend upon cost, the benefit derived from collocation of <br />various services, and consideration of how the building can best be used to serve the public. The City <br />Hall Master Plan provides a significant amount of detail that can be used to develop a more structured <br />plan. <br /> <br />Although the council had decided that a new City Hall should be built on the existing site, the council <br />also subsequently expressed interest in considering the EWEB Administrative Building site for <br />relocation of City Hall. In May 2009, the council directed staff to send a letter to EWEB to notify them <br />that city officials wish to have first right of refusal for this site if EWEB decides to sell. To-date, the <br />City has not received any information from EWEB regarding their intent to sell the facility. <br /> <br /> <br />TIMELINE <br />The functional, structural, and safety issues at City Hall require development of a short-term plan and <br />timeline to address these problems. In addition to the seismic vulnerability and deteriorating state of the <br />facility, a primary driver for the replacement of the building is the EWEB steam conversion process <br />currently scheduled to be complete by June 2012 (although that date could change). Staff will begin <br />working on plans to vacate City Hall and relocate in temporary space until a permanent City Hall <br />solution is approved and built. This will address safety concerns while addressing a permanent plan for <br />the site. <br /> <br />Funding for the City Hall project is one of several major funding priorities to be considered as part of <br />building a sustainable budget. Consideration of a bond measure for City Hall should take into account <br />other future bond measures such as street bonds, potential new revenue sources, and other funding <br />initiatives proposed within the jurisdiction. <br /> <br />If the council adopts the recommended motion, staff will (a) work on plans for the temporary relocation <br />of City Hall functions consistent with EWEB’s planned steam conversion timeline, and (b) return to the <br />council with a concept plan for a new City Hall and a proposed financial strategy. <br /> <br /> Z:\CMO\2010 Council Agendas\M100908\S1009082.doc <br /> <br />