Laserfiche WebLink
Second, the .Department.Of Environmental Quality~uidelines <br /> recommend that sewer'treatment facilities should be planned and.'~. <br /> constructed for ~ 20-~ear pOpulation projection period. <br /> <br /> The plgnninghorizon in the amendments is appropriate for the <br /> nature ofthe planned facilities. Sewer treatment facilities <br /> should be constructed with long range planning goals. <br /> <br /> 3. The. proposed PFSP amendments are a pro~ect list as required by <br /> state statutes and implementing regulations. <br /> <br /> Home Builders .insists that the proposed PFSP amendments, <br /> particularly the proposed new tables, are not a ~project list" <br /> within the meaning of state statutes and regulations. Home <br /> Builders argument is without merit. The proposed_ sanitary seWer <br /> project list is comparable to the.exiSting project lists in the <br /> PESP by Springfield Utility Board, EWEB and the other <br /> participating jurisidictions' lists. The proposed list'also <br /> 'complies with the LCDC's Goal 11 implementing administrative <br /> rules. <br /> <br /> OAR 660-001-0005(6) defines ~public facility project" as follows': <br /> ~A public facility project is the construction or <br /> reconstruction of a water, sewer, or transportation <br /> facility within a public facility/system that is funded <br /> or utilized by members'of the public.." <br /> <br /> Public facility system, as it relate~ to sanitary sewers, are <br /> limited to the following: a) treatment facility system; and/or b) <br /> primary collection system. (OAR 660-011-0005(7)). <br /> <br />· ' ProPosed Table 16a lists six treatment 'facility system projects: <br /> WPCF Treatment Project; Residual Treatment Project; and <br /> Beneficial ReuseProject. It also includes three pump stations <br /> (i.e., collection, system projects): Willakenzie Pump Station, <br /> Screw Pump Station and Glenwood Pump Station. This list complies <br /> with both the statute and the administrative rule definition of <br /> ~project list." <br /> <br /> In their oral testimony Home Builders stated that a more <br /> appropriate list of projects for PFSP purposes would be MWMC's <br /> 20-year project list that is included in MWMC's 2004 Facilities <br /> Plan. MWMC adopted the 2004 Facilities Plan and 20-year project <br /> list to satisfy DEQ requirements for facilities planning and to <br /> .comply with the requirements of ORS 223.309(1) that a facilities <br /> plan and list of proposed capital improvements be adopted prior <br /> to the establishment of a system development charge. <br /> <br /> <br />