5. Modify Chapter IV. Of the Public Facilities and Services Plan, by modifying
<br /> the discussion of wastewater, in the subdivision entitled "Long-Term Service
<br /> Availability Within Urbanizable Areas" (presently on page 97) to read as
<br /> follows:
<br />
<br />1. There are no areas within the metropolitan UGB that will be difficult to serve with
<br />wastewater facilities over the long-term (six to 20 years) assuming that public
<br />inl~astructure specifications and requirements of the developing area can be
<br />addressed. Appropriate engineering design practices must be used during the
<br />development and expansion into sensitive areas that are approved for
<br />development (ex. - hillside construction, etc.).,' *'..,,..,~.,~., ......... expansion Expansion of
<br />the existing collection system will be necessary to meet demands of growth over
<br />this time period.
<br />2. Based on 2003 analysis, the Eugene-Springfield metropolitan area treatment
<br />facilities will require facility improvements to address both dry and wet weather
<br />regulatory requirements relating to pollutant loads and wastewater flows.
<br />Regional and local wastewater improvements to the collection and treatment
<br />systems are being planned for and will be implemented to allow for growth within
<br />the UGB and for regulatory compliance.
<br />w,.~l~W~,J ,.,wj,.,,,,,o. ,.,.Aw j,.,o.,. ,..,..,-,.,, .
<br />6. Add Table 16a following Table 16, as follows:
<br />Table
<br />MWMC Wastewater Treatment and Collection System Improvements, Rough Cost
<br />Estimate, and Timing Estimate
<br />
<br /> 300 WPCF Treatment Project $120,500,,,,,,, 2025
<br /> 301 Residuals Treatment Project $6,000,,~,,,, 2018
<br /> 302 Beneficial Reuse Project $25,000,,~,,,, 2018
<br /> 303 Willakenzie Pump Station $6,000 .... 2010
<br /> 304 Screw Pump Station $2,000~,,,,,, 2010
<br /> 305 Glenwood Pump Station $500,,,,,,, 2012
<br /> *Cost estimated in 2004 dollars