Laserfiche WebLink
CE–ICAP* <br />ITY OF UGENE NTERNAL LIMATE CTION LAN <br />The Internal Greenhouse Gas Inventory was completed in 2005. Actions that have been put in <br />place since that time are not reflected in the 2005 emissions figures, the starting point for our <br />emissions reduction goal. The actions outlined in figure 11 have enabled emissions reductions <br />from 2005 levels and are considered part of the plan. Assuming that these actions, and those put <br />in place before 2000, remain in place, a new inventory conducted today would be expected to <br />show a nearly 8% reduction in city operational emissions since 2005. <br />Action Plan for 2012 <br />The near-term of the Action Plan includes measures recommended for implementation by 2012. <br />Measures are prioritized for this timeframe due to the relative ease of completion within less than <br />three years. <br />Four of these actions are underway, or soon will be. The High Efficiency Gas Conversion and <br />Upgrade Small HVAC actions are included in a formal agreement to fund under the Energy <br />Efficiency and Conservation Block Grant. Actions Fine Tune Pool Schedules and Upgrade <br />Remaining Inefficient Lighting fall under the existing Energy Management program and will be <br />folded into that work plan over the timeframe. <br />However, staff time and some level of funding will need to be identified for the remaining four <br />actions identified in the near-term plan; City Operations Transportation Policy, Expanded <br />Purchase of GreenPower, Fitness Equipment Generates Power, Expanded Energy Education. <br />16 <br /> <br />*Plan adopted as a framework; subject to additional edits. Plan may be modified pending implementation. <br />