My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: Community Climate and Energy Action Plan Update
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 09/15/10 Work Session
>
Item B: Community Climate and Energy Action Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2010 11:20:12 AM
Creation date
9/10/2010 11:11:30 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
9/15/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CE–ICAP* <br />ITY OF UGENE NTERNAL LIMATE CTION LAN <br />Timeframes in this report are represented by the year in which the Action is fully implemented <br />and actively reducing emissions. <br />iv.Actions taken Prior to 2005 <br />The City of Eugene has been actively taking steps to reduce energy use, cost and emissions for <br />nearly two decades. There are two categories of such “historical” actions outlined below. <br />Actions implemented between 1990 and 2000, the baseline for the internal inventory, are shown <br />in figure 9 below. Though that period shows growth in emissions, the impact of these efforts <br />should not be underestimated. These are the projects and programs that helped to slow the <br />growth in our operational emissions and set the stage for the decreases that occurred between <br />2000 and 2005. It’s important that these projects and programs be kept in place as we pursue <br />greater reductions in emissions. <br />Installed LED traffic lights to replace incandescent <br />Installed LED lighting for Airport taxiway <br />Installed energy-efficient high pressure sodium street lighting <br />Generated electricity from methane recovery at wastewater treatment plant <br />Implemented an energy tracking and management program <br />Conducted energy audits of all major municipal facilities <br />Installed energy-efficient exit sign lighting <br />Performed energy-efficient lighting retrofits <br />Program to swap out space heaters and incandescent desk lamps <br />Energy Star <br />Installed roofing when roof needs replacement <br />Installed energy-efficient vending machines <br /> Figure 9 <br />14 <br /> <br />*Plan adopted as a framework; subject to additional edits. Plan may be modified pending implementation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.