My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Draft EUG Master Plan Update, February 2010
COE
>
City of Eugene
>
Ordinances
>
2010 No. 20450-20469
>
Ordinance No. 20463
>
Draft EUG Master Plan Update, February 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2010 5:36:43 PM
Creation date
9/29/2010 5:35:49 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20463
Document_Title
Draft EUG Master Plan Update, February 2010
Adopted_Date
9/27/2010
Approved Date
9/27/2010
Signer
Kitty Piercy
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4 <br />ALTERNATIVE PLAN CONCEPTS <br />Overflow Lot <br />The overflow parking lot, located east of Douglas Drive, provides 585 stalls for peak passenger travel <br />times, such as sporting events and holiday travel. By expanding east, there is space to increase the lot <br />by approximately 50% to 872 stalls. Longer term expansion may also be accommodated by expanding <br />north and south, as space is available and need arises. As the overflow lot is not regularly used for <br />passenger parking, it is likely acceptable to have this lot separate from the main lot, and to continue to <br />offer shuttling service for passengers between this lot and the terminal building for those peak periods of <br />demand. <br />Rental Car Service Facility and Storage Lot <br />As the rental car service facility has fulfilled its useful and economical life, a new, modern, and larger <br />facility is needed to provide more service space, and to accommodate the parking of vehicles queued for <br />service, and those which have been serviced and await rental. The current 116 service/storage stalls at <br />the existing facility are expected to need to be increased to 280. This increase of 164 cannot be <br />accommodated at the existing site without sacrificing passenger automobile parking and the ability to <br />expand the same. <br />As giving priority to passenger automobile parking enhances customer service and passenger <br />convenience, the rental car service facility and storage lot (which are not required, by function, to be in <br />such close proximity to the terminal building) will require relocation. Rental car service/storage operations <br />are proposed to be relocated to the south airfield. This rental car service facility will likely see increased <br />activity as passenger enplanements increase at EUG. The proposed south airfield site accommodates <br />the future expansion of this facility, which could not be accommodated in the existing location. <br />As the rental car service/storage lot is relocated, this site can be converted for temporary uses until long- <br />term improvements are implemented. Cell phone waiting lot, taxicab queue lot, rental car ready/return <br />parking, and passenger automobile parking are all suitable uses for this site, until improvements for each <br />of these additional facilities are developed, and the existing configuration is redeveloped for expansion of <br />rental car ready/return and public parking. <br />Public Transportation and Taxicab Area <br />The Eugene metro area benefits from an expansive public transportation network, and as passenger <br />movements at EUG increase, it is expected that the use of public transportation will also increase. As the <br />primary EUG destination would likely be the main passenger terminal building, direct terminal access <br />should be provided for public transportation. <br />As the main parking lot is expanded to the existing rental car service/storage area, there is expected to be <br />space for additional taxicab parking/waiting, as an extension to the existing taxicab parking/waiting area, <br />located between the terminal building and the main parking lot. The current taxicab area, and the <br />expanded taxicab area, can also be used for public transportation transfer, between the buses and the <br />terminal building. However, as the proposed taxicab queue lot is introduced as part of the realigned <br />Douglas Drive, it may be better and desirable to convert the existing taxicab parking/waiting to serve <br />primarily public transportation loading and pedestrian movement, and shift taxicab queuing to the new lot. <br />4-38 <br />Eugene Airport Master Plan Update <br />(February 2010) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.