My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20461
COE
>
City of Eugene
>
Ordinances
>
2010 No. 20450-20469
>
Ordinance No. 20461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 1:24:23 PM
Creation date
1/21/2011 3:32:58 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
8/11/2010
Document_Number
20461
Author
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Glacier Drive 55th Street to 48th Street Develop new, 2 -lane urban Springfield $1,840,000 0.92 57 <br />facility <br />Ext <br />McKenzie - Gateway <br />Geographic <br />New 2 to 3 -lane collector <br />Springfield <br />Estimated <br />0.8 <br />756 <br />Name <br />Limits.. <br />Description <br />Jurisdiction <br />Cost <br />Length Number <br />Future Collector C7 <br />North -south in mid - Natron <br />New 2 to 3 -lane urban <br />Springfield <br />$1,512,000 <br />0.56 <br />51 <br />762 <br />site <br />collector <br />north -south collector <br />S <br />$2,489,090 <br />Future Collector E <br />Bailey Hill Road to <br />New major collector <br />Eugene <br />$2,700,000 <br />1 <br />318 <br />' <br />Bertelsen Road <br />2 -lane collector <br />Future Collector F <br />Royal Avenue to Terry <br />New major collector <br />Eugene <br />$1,890,000 <br />0.7 <br />429 <br />Street <br />Future Collector H <br />Future Collector G to <br />New major collector <br />Eugene <br />$1,350,000 <br />0.5 <br />435 <br />Bridge Road <br />Royal Avenue <br />collector <br />Future Collector J <br />Awbrey Lane to Enid <br />New major collector <br />Eugene <br />$2,160,000 <br />0.8 <br />441 <br />Road <br />. <br />Future Collector C <br />` <br />Barger Drive to Avalon <br />New neighborhood collector <br />Eugene <br />$1,800,000 <br />0.5 <br />447 <br />Street <br />Future Collector P <br />Avalon Street to Future <br />New neighborhood collector <br />Eugene <br />$4,500,000 <br />1.11 <br />449 <br />Collector F <br />Glacier Drive 55th Street to 48th Street Develop new, 2 -lane urban Springfield $1,840,000 0.92 57 <br />facility <br />Ext <br />McKenzie - Gateway <br />Within MDR site <br />New 2 to 3 -lane collector <br />Springfield <br />$2,160,000 <br />0.8 <br />756 <br />MDR Loop Collector <br />into MDR site <br />MDR Site <br />North -south within MDR <br />Construct new 3 -lane <br />Springfield <br />$1,440,004 <br />0.4 <br />762 <br />site <br />north -south collector <br />S <br />$2,489,090 <br />. Mt Vernon Road <br />Jasper Road Extension to Extend existing street as <br />Springfield <br />$540,000 <br />0.9 <br />0.2 <br />81 <br />' <br />Mountaingate Drive <br />2 -lane collector <br />V Street <br />31st Street to Marcola <br />New 2 to 3 -lane collector <br />Springfield <br />$1,755,000 <br />0.65 <br />777 <br />Road <br />' Vera Drive /Hayden <br />15th Street to 20th Street <br />New 2 to 3 -lane urban <br />Springfield <br />$918,000 <br />0.34 <br />780 <br />Bridge Road <br />collector <br />TramPlan July 2002 <br />Chapter 3, Wage 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.